Presidente Kennedy power station (Usina Termelétrica Presidente Kennedy) is a power station in the pre-permit stage in Presidente Kennedy, Espírito Santo, Brazil.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Presidente Kennedy power station | Presidente Kennedy, Espírito Santo, Brazil | -21.203633, -41.01258 (approximate)[1][2] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit I | pre-permit[1][3] | fossil gas - LNG[3][4] | 575[1][3] | combined cycle[5] | – | – | – |
Unit II | pre-permit[1][3] | fossil gas - LNG[3][4] | 575[1][3] | combined cycle[5] | – | – | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit I | Geradora de Energia do Espírito Santo SA [100%] | Energias de Portugal SA |
Unit II | Geradora de Energia do Espírito Santo SA [100%] | Energias de Portugal SA |
Background
Espírito Santo will receive up to 4.5 billion reais of investment for the President Kennedy Power Station which will provide power for 3.5 million households.[6] The two-unit power station project is planned to connect with the proposed Presidente Kennedy FSRU import terminal and a gas pipeline (two segments).[7] The estimated generating capacity of each unit has increased from 440 MW to 575 MW since the plant was first announced.[8][9][10][11][12]
The Presidente Kennedy power station received its preliminary license from Espírito Santo's state environmental authority in July 2019, followed by an installation license in February 2020.[13]
Both units of the Presidente Kennedy plant were listed as participants in Brazil's national energy auctions in September and December 2021[10][14], but did not emerge victorious at either auction.[15]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125090259/https://app.powerbi.com/view?r=eyJrIjoiNjc4OGYyYjQtYWM2ZC00YjllLWJlYmEtYzdkNTQ1MTc1NjM2IiwidCI6IjQwZDZmOWI4LWVjYTctNDZhMi05MmQ0LWVhNGU5YzAxNzBlMSIsImMiOjR9. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125123244/https://iema.es.gov.br/Media/iema/CQAI/EIA/2013/Usina%20termel%C3%A9trica%20%C3%A0%20g%C3%A1s%20-%20Presidente%20KennedyES/capitulo2-%20Caracteriza%C3%A7%C3%A3o.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240125090343/https://in.gov.br/en/web/dou/-/portaria-n-937/spe/mme-de-14-de-setembro-de-2021-345097967. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://web.archive.org/web/20240125090323/https://www.epe.gov.br/sites-pt/publicacoes-dados-abertos/publicacoes/PublicacoesArquivos/publicacao-527/NT%20Terminais%20de%20GNL%20no%20Brasil%20-%20Panorama%20dos%20Principais%20Projetos.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240125112435/https://iema.es.gov.br/Media/iema/Downloads/RIMAS/RIMAS_2013/2017.04.06%20-%20RIMA_GERA.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Grupo quer investir R$ 4,5 bi em termelétrica e criar 2 mil empregos no ES" (in português do Brasil). Retrieved 2021-09-13.
- ↑ "Plano Indicativo de Terminais de GNL" (PDF). Empresa de Pesquisa Energética. July 2021. Retrieved September 13, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Sistema de Informações Georreferenciadas do Setor Elétrico (SIGEL)". Agência Nacional de Energia Elétrica (ANEEL, Brazilian Electricity Regulatory Agency). Archived from the original on April 9, 2020. Retrieved May 7, 2021.
- ↑ "RIMA - Relatório de Impacto Ambiental Usina Termelétrica à Gás - Presidente Kennedy/ES" (PDF). Instituto de Meio Ambiente e Recursos Hídricos. April 1, 2013. Archived (PDF) from the original on May 3, 2021. Retrieved May 4, 2021.
- ↑ 10.0 10.1 "PORTARIA Nº 937/SPE/MME". Ministério de Minas e Energia/Secretaria de Planejamento e Desenvolvimento Energético. September 14, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Presidente Kennedy abrigará usina termelétrica e deve gerar 1,5 mil empregos". Gazeta Online. April 27, 2017. Archived from the original on May 5, 2021. Retrieved May 4, 2021.
- ↑ "Terminais de Regaseificação de GNL no Brasil: Panorama dos Principais Projetos" (PDF). Empresa de Pesquisa Energética. August 30, 2019. Archived (PDF) from the original on May 3, 2021. Retrieved May 4, 2021.
- ↑ "Terminais de GNL no Brasil (pp 21-22)" (PDF). EPE (Empresa de Pesquisa Energética). October 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Diário Oficial União – 07/12/2021". ABRAPCH. 2021-12-07.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Leilões - Agenda e Resultados". CCEE. Retrieved 2022-11-29.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.