Huadian Changji power station (华电新疆昌吉热电厂) is an operating power station of at least 660-megawatts (MW) in Binhu Xiang, Changji, Changji Hui Autonomous Prefecture, Xinjiang, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huadian Changji power station Binhu Xiang, Changji, Changji Hui Autonomous Prefecture, Xinjiang, China 44.06325, 87.326558 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase III Unit 5, Phase III Unit 6: 44.06325, 87.326558
  • Phase II Unit 3, Phase II Unit 4: 43.99144, 87.31149

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase II Unit 3 retired coal - bituminous 125 subcritical 2006 2018
Phase II Unit 4 retired coal - bituminous 125 subcritical 2006 2018
Phase III Unit 5 operating coal - bituminous 330 subcritical 2011
Phase III Unit 6 operating coal - bituminous 330 subcritical 2011

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase II Unit 3 Xinjiang Huadian Changji Thermal Power Erqi Co Ltd [100.0%]
Phase II Unit 4 Xinjiang Huadian Changji Thermal Power Erqi Co Ltd [100.0%]
Phase III Unit 5 Xinjiang Huadian Changji Thermoelectricity Co Ltd [100.0%]
Phase III Unit 6 Xinjiang Huadian Changji Thermoelectricity Co Ltd [100.0%]

Project-level coal details

  • Permit(s): August 20, 2009

Background

The first two units of the power station, totaling 24 MW, were built in 1999 and retired in 2008. Units 3 and 4, totaling 250 MW, were brought online in 2006 and are located within the city. Units 5 and 6 (2 x 330 MW) were completed in 2011 but at a new location north of the city. The plant is owned by China Huadian.[1][2][3]

Units 3-4 were retired in May 2018.[4]

Project Details of units 3-4

  • Sponsor: China Huadian
  • Location: Binhu Village, Binhu Xiang, Changji City, Changji Hui Autonomous Prefecture, Xinjiang Uyghur Autonomous Region, China
  • Coordinates: 43.99144, 87.31149 (exact)
  • Status: retired
  • Gross capacity: 250 MW (Units 3 & 4: 125 MW)
  • Type: Subcritical
  • In service: 2006
  • Coal type: Bituminous
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. "昌吉热电厂一号机组首次并网成功", 中国华电集团公司, 2011-11-03
  2. "昌吉热电厂实现一年“双投”目标", 中国华电集团公司, 2012-01-04
  3. "华电昌吉热电厂煤尘污染村庄环保局开50万罚单", 网易财经, 2013-04-11
  4. "淘汰落后产能按下“快进键," 人民日报, 2018年05月15日