This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
|
Sub-articles:
|
|
Amal-Ra's Lanuf Oil Pipeline خط آنابيب آمال - رأس لانوف , is an operating oil pipeline, running from Amal oilfield in the Sirte basin, central Libya, to Ra's Lanuf terminal 23km from Sidra terminal, Libya.[1] [2]
Location
The pipeline runs from Amal oilfield in Al Wahat district, to Ra's Lanuf terminal on the Gulf of Sidra, 650km from Tripoli, Libya. [3][1]
Loading map...
{"type":"HYBRID","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":30,"lon":19.8,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.4846,"lon":21.1056},{"lat":29.4845,"lon":21.0967},{"lat":30.1895,"lon":19.1429},{"lat":30.2487,"lon":18.9739},{"lat":30.2745,"lon":18.9357},{"lat":30.3305,"lon":18.7671},{"lat":30.3865,"lon":18.6493},{"lat":30.4723,"lon":18.551}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Background
The Amal-Ra's Lanuf oil pipeline is two parallel pipelines, 30 inches and 36 inches. The capacity of each is 13,195,771 and 23,752,387, respectively. The Harouge Oil Operations, which operates the pipeline, is a joint venture of the state-owned Libyan National Oil Corporation(NOC) (88%)& SUNCOR Energy (12%).[4]
Project details
Pipeline 1
Loading map...
{"type":"HYBRID","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":30,"lon":19.8,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.4846,"lon":21.1056},{"lat":29.4845,"lon":21.0967},{"lat":30.1895,"lon":19.1429},{"lat":30.2487,"lon":18.9739},{"lat":30.2745,"lon":18.9357},{"lat":30.3305,"lon":18.7671},{"lat":30.3865,"lon":18.6493},{"lat":30.4723,"lon":18.551}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Harouge Oil Operations[5]
- Owner: Libyan National Oil Corporation(NOC)& SUNCOR Energy[4]
- Parent Company: Libyan National Oil Corporation(NOC) (88%)& SUNCOR Energy (12%)[4]
- Current capacity: 13.195771 mtpa[6]
- Length: 272.39 km / 169.26 mi[6]
- Diameter: 30 inches[6]
- Status: Operating
- Start Year:
- Cost:
- Financing:
- Associated infrastructure:
Pipeline 2
Loading map...
{"type":"HYBRID","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":30,"lon":19.8,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":29.4846,"lon":21.1056},{"lat":29.4845,"lon":21.0967},{"lat":30.1895,"lon":19.1429},{"lat":30.2487,"lon":18.9739},{"lat":30.2745,"lon":18.9357},{"lat":30.3305,"lon":18.7671},{"lat":30.3865,"lon":18.6493},{"lat":30.4723,"lon":18.551}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator: Harouge Oil Operations[5]
- Owner: Libyan National Oil Corporation(NOC) & SUNCOR Energy[4]
- Parent Company: Libyan National Oil Corporation(88%)& SUNCOR Energy (12%)[4]
- Current capacity: 23.752387 mtpa[6]
- Length: 272.39 km / 169.26 mi[6]
- Diameter: 36 [6]
- Status: Operating
- Start Year:
- Cost:
- Financing:
- Associated infrastructure:
Articles and resources
References
Related GEM.wiki articles
External resources
External articles