Recent changes
From Global Energy Monitor
Track the most recent changes to the wiki on this page.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
10 September 2025
18:33 | Aktobe Generatsiya steel plant diffhist +63 NataliaFretz talk contribs (→Background) |
18:18 | Aktobe Ferroalloy Plant power station diffhist +1,423 NataliaFretz talk contribs (→Articles and Resources) |
18:12 | Trans-Caspian Gas Pipeline diffhist −1,084 Isabel Mahon talk contribs |
17:46 | Aktobe 2 power station diffhist +4 NataliaFretz talk contribs (→Background) |
|
02:36 | Xinjiang Oil and Gas Project (Xinjiang, China) 5 changes history +24 [Xiaojun (5×)] | |||
|
02:36 (cur | prev) −45 Xiaojun talk contribs | ||||
|
01:54 (cur | prev) +41 Xiaojun talk contribs | ||||
|
01:50 (cur | prev) −29 Xiaojun talk contribs | ||||
|
01:46 (cur | prev) +8 Xiaojun talk contribs | ||||
|
01:42 (cur | prev) +49 Xiaojun talk contribs |
01:41 | Move log Xiaojun talk contribs moved page Karamay Oil and Gas Field (Xinjiang, China) to Xinjiang Oil and Gas Project (Xinjiang, China) (change the title and some context of this wikipage) |
|
00:09 | Novo Mesto-Bela Krajina Gas Pipeline 2 changes history +596 [Dan O'Beirne (2×)] | |||
|
00:09 (cur | prev) −210 Dan O'Beirne talk contribs Tag: Visual edit | ||||
|
00:09 (cur | prev) +806 Dan O'Beirne talk contribs Tag: Visual edit |
|
N 00:01 | Anže - Brestanica Gas Pipeline 2 changes history +1,234 [Dan O'Beirne (2×)] | |||
|
00:01 (cur | prev) +649 Dan O'Beirne talk contribs Tag: Visual edit | ||||
N |
|
00:00 (cur | prev) +585 Dan O'Beirne talk contribs (Created page with "{{Navbar-Global Gas Infrastructure Tracker}}'''The Anže - Brestanica Gas Pipeline''' is a proposed gas pipeline in Slovenia. ==Location== The pipeline runs from Anže to Brestanica. ==Project details== ===Main Line=== *'''Operator: ''' Plinovodi d.o.o *'''Owner: ''' Plinovodi d.o.o *'''Parent company: ''' *'''Capacity: ''' *'''Length: ''' 4.5 km *'''Diameter: ''' 250,400 mm *'''Status: ''' proposed *'''StartYear1: ''' 2027 *'''Cost: ''' EUR 6.2 million *'''Financing:...") |
9 September 2025
23:45 | Ajdovščina – Lucija Gas Pipeline diffhist −8 Dan O'Beirne talk contribs |
|
N 23:37 | TGNL São Luis FSRU 2 changes history +4,005 [Gregorclark (2×)] | |||
|
23:37 (cur | prev) +2,599 Gregorclark talk contribs (→Project Details) Tag: Visual edit | ||||
N |
|
23:12 (cur | prev) +1,406 Gregorclark talk contribs (Created page with "{{Navbar-Global Gas Infrastructure Tracker}} '''TGNL São Luis FSRU''' is a proposed floating LNG Terminal in the state of Maranhão, Brazil. ==Location== The proposed terminal would be located on the Ilha da Boa Razão near São Luis de Maranhão. {{#display_map:-2.6702340, -44.3784400|width=400|height=300|type=satellite|zoom=13}} ==Project Details== *'''Owner: ''' *'''Parent company:''' *'''Location: ''' Ilha da Boa Razão, São Luis, Maranhão state, Brazil *'''C...") |
23:19 | Prestige power station diffhist +1,288 Jeanette Lim talk contribs |
23:10 | Dauletabad-Sarakhs-Khangiran Gas Pipeline diffhist +55 AiganymV talk contribs (→Pipeline II) |
22:57 | Sergipe FSRU diffhist +2 Gregorclark talk contribs (→Ownership) |
22:56 | Presidente Kennedy FSRU diffhist +2 Gregorclark talk contribs (→Opposition) |
|
22:55 | Vodice-Jarše-Novo mesto pipeline 3 changes history +138 [Dan O'Beirne (3×)] | |||
|
22:55 (cur | prev) −249 Dan O'Beirne talk contribs Tag: Visual edit: Switched | ||||
|
22:54 (cur | prev) −64 Dan O'Beirne talk contribs Tag: Visual edit | ||||
|
22:53 (cur | prev) +451 Dan O'Beirne talk contribs Tag: Visual edit |
22:52 | Cosan FSRU diffhist 0 Gregorclark talk contribs (→Opposition) |
22:47 | Vista Pacifico LNG Terminal diffhist +4 Gregorclark talk contribs (→Background) |
22:47 | Salina Cruz LNG Terminal (CFE) diffhist +4 Gregorclark talk contribs (→Opposition and other challenges) |
22:44 | Lakach Field FLNG Terminal diffhist +5 Gregorclark talk contribs (→Opposition) |
22:43 | Costa Azul LNG Terminal diffhist +52 Gregorclark talk contribs (→Background) |
22:39 | Coatzacoalcos LNG Terminal diffhist +5 Gregorclark talk contribs (→Opposition) |
22:27 | Kalce-Škofja Loka Gas Pipeline diffhist +492 Dan O'Beirne talk contribs |
22:27 | Golfo San Matías FLNG Terminal diffhist −10,255 Gregorclark talk contribs (Redirected page to Argentina LNG Terminal) |
22:23 | New Fortress Altamira LNG Terminal diffhist −67 Gregorclark talk contribs |
|
21:57 | Suape FSRU 2 changes history +2,788 [Gregorclark (2×)] | |||
|
21:57 (cur | prev) +55 Gregorclark talk contribs (→Background) Tag: Visual edit | ||||
|
21:55 (cur | prev) +2,733 Gregorclark talk contribs (→Background) Tag: Visual edit |
|
N 20:58 | Power Sector Transition in the West African Power Pool 3 changes history +2,246 [Hailey Deres (3×)] | |||
|
20:58 (cur | prev) +20 Hailey Deres talk contribs (→Introduction) | ||||
|
20:51 (cur | prev) +143 Hailey Deres talk contribs (→Introduction) | ||||
N |
|
20:14 (cur | prev) +2,083 Hailey Deres talk contribs (Created page with "==Introduction== ===Symbolic Importance=== ==Current System Description== ===Current Power Capacity Mix=== {| class="wikitable" |- ! Energy Source !!Installed Capacity(MW) !! Percentage |- | Energy1 ||MW || % |- | Energy2 ||MW || % |- | Energy3 ||MW || % |- | Energy4 ||MW || % |- | Energy5|| MW || % |- | Total|| MW || |} ===Prospective Power Capacity=== {| class="wikitable" |- ! Energy Source !!Announced !! Pre-construction !! Construction!! Total |- | Energy1 ||MW ||...") |
20:40 | Saguaro Energía LNG Terminal diffhist −68 Gregorclark talk contribs (→Project details) |
|
19:57 | Argentina LNG Terminal 4 changes history +89 [Gregorclark (4×)] | |||
|
19:57 (cur | prev) −9 Gregorclark talk contribs (→Phase 2) Tag: Visual edit | ||||
|
19:52 (cur | prev) −3 Gregorclark talk contribs (→Location of the project) Tag: Visual edit | ||||
|
19:45 (cur | prev) +54 Gregorclark talk contribs Tag: Visual edit | ||||
|
19:43 (cur | prev) +47 Gregorclark talk contribs Tag: Visual edit |
19:41 | Move log Gregorclark talk contribs moved page Argentina GNL Terminal to Argentina LNG Terminal (Originally most references used the Spanish name Argentina GNL, but now lots of sources (including the project owners) are saying Argentina LNG) |
m 19:38 | Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline diffhist −29 Dan O'Beirne talk contribs (→Background) |
|
19:25 | Argentina GNL Terminal 2 changes history +1,393 [Gregorclark (2×)] | |||
|
19:25 (cur | prev) +699 Gregorclark talk contribs (→Phase 1 (Southern Energy SA)) Tag: Visual edit | ||||
|
19:04 (cur | prev) +694 Gregorclark talk contribs (→Phase 3 (Eni SpA)) Tag: Visual edit |