Arad County solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Arad County solar farm is a solar photovoltaic (PV) farm in pre-construction in Arad, Romania.

Project Details

Table 1: Phase-level project details for Arad County solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2025 (planned)[1] 1044 MW[1] PV[1] Rezolv Energy[1] Rezolv Energy[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Arad County solar farm

Location Coordinates (WGS 84)
Arad, Arad, Romania[1] 46.1835, 21.3156 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.pv-magazine.com/2022/11/03/uk-developer-acquires-europes-largest-pv-project/. {{cite web}}: Missing or empty |title= (help)
  2. https://www.powermag.com/group-readies-for-construction-of-europes-largest-solar-farm/?oly_enc_id=2537D6716101J0Q. {{cite web}}: Missing or empty |title= (help)