ArcelorMittal Bellary steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

ArcelorMittal Bellary steel plant is a steel plant in Ballari, Kudithini, Bellary, Karnataka, India that operates steelmaking and ironmaking technology.

Location

The map below shows the approximate location of the plant in Ballari, Kudithini, Bellary, Karnataka, India:

Loading map...
  • Location: Ballari, Karnataka, India
  • Coordinates (WGS 84): 15.139498, 76.918417 (approximate)

Background

In a Global investor Meet in 2010, ArcelorMittal signed an MoU with the Karnataka state government for establishing a 6 mtpa integrated steel plant and a 750MW captive power plant with an investment of INR 30,000 crores.[1] On 26 December 2018, ArcelorMittal executed a deal with Karnataka government a lease-cum-sale agreement for 2,643 acres of land in Ballari, Karnataka for constructing the steel plant and captive power plant.[2] In December 2022, the Karnataka state government decided to recover the land allotted to ArcelorMittal as the project did not take off.[3]In October 2023, ArcelorMittal decided to return the entire 2,643 acres of land and forfeit INR 267 crores spent on setting up the Ballari plant.[4][5]

Plant Details

Table 1: General Plant Details

Announced date Power source
2010[6] 750 MW power generation plant planned[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
ArcelorMittal SA 5000030092 E100000000687 ArcelorMittal SA[8] 5000030092 E100000000687

Table 3: Process and Products

Main production equipment
Iron other/unspecified; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
cancelled 6000[7][9] 6000[7][9]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Other/unspecified iron capacity Nominal iron capacity (total)
cancelled 0 0

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
NF NF NF

Unit Details

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. Correspondent, Special (2019-03-10). "ArcelorMittal seeks extension till December 2023 to set up plant". The Hindu. ISSN 0971-751X. Retrieved 2023-12-23.
  2. "ArcelorMittal keeps $6.5-billion steel, power project in Karnataka 'under review'". Financialexpress. 2020-03-11. Retrieved 2023-12-23.
  3. "Govt to take back 5,000 acres allotted to ArcelorMittal: Bommai". Deccan Herald. Retrieved 2025-01-20.
  4. "ArcelorMittal decides to return 2643 acres land meant for steel plant at Karnataka's Ballari, SC told". www.deccanherald.com. Retrieved 2023-12-23.
  5. "Desirous to return 2643 acres land for steel plant in Ballari: ArcelorMittal tells SC". LawBeat. Retrieved 2023-12-23.
  6. https://web.archive.org/web/20221120035331/https://timesofindia.indiatimes.com/city/bengaluru/12-years-on-karnataka-still-waits-for-arcelormittal-to-invest/articleshow/95519550.cms. Archived from the original on 2022-11-20. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20210512195622/https://www.thehindu.com/news/national/karnataka/arcelormittal-seeks-extension-till-december-2023-to-set-up-plant/article26490538.ece. Archived from the original on 2021-05-12. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20220112161543/https://www.financialexpress.com/industry/arcelormittal-keeps-6-5-billion-steel-power-project-in-karnataka-under-review/1894108/. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)