CLOV 3 Oil Phase (Angola)
From Global Energy Monitor
(Redirected from CLOV Phase 3 Oil Project (Angola))
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
Related categories: |
CLOV 3 Oil Phase is an in development oil phase in Angola.
Along with Cravo Oil and Gas Field (Angola), Lirio Oil and Gas Field (Angola), Orquidea Oil and Gas Field (Angola), and Violeta Oil and Gas Field (Angola), CLOV 3 Oil Phase is a part of the CLOV Oil Project (Angola). CLOV 3 Oil Phase is also sometimes referred to as Cravo, Lirio, Orquidea, Violeta.
Project Details
Main Data
Table 1: Phase-level project details for CLOV 3 Oil Phase
Unit name | Status | Operator | Owner | Discovery year | FID1 year | Production start year | Production type2 |
---|---|---|---|---|---|---|---|
CLOV 3 | In development[1][2] | TotalEnergies[1] | TotalEnergies (38.0%); ExxonMobil (19.0%); BP (15.84%); Sonangol Pesquisa e Produção (5.0%); Equinor (22.16%)[3] | – | 2022[4] | 2025 (expected)[1] | Conventional |
Production and Reserves
Table 2: Reserves of CLOV 3 Oil Phase
Fuel description | Reserves classification | Quantity | Units | Data year | Source |
---|---|---|---|---|---|
liquids | resources | 60 | million bbl | 2022 | [1] |
Location
Table 3: Phase-level location details for CLOV 3 Oil Phase
Concession/Block | Location | Onshore/Offshore | Coordinates (WGS 84) |
---|---|---|---|
Block 17[5] | Offshore, Angola[6] | Offshore[7] | -7.4145, 11.5811 (exact)[6] |
The map below shows the exact location of the phase(s) within the CLOV complex:
Articles and Resources
Additional Data
To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 African Energy Chamber (44859). "The State of African Energy 2023 Outlook" (PDF). African Energy Chamber. Archived from the original (PDF) on December 9, 2022. Retrieved December 9, 2022.
{{cite web}}
: Check date values in:|date=
(help); Invalid|url-status=Live
(help) - ↑ https://www.linkedin.com/pulse/clov-phase-3-project-boost-angolan-local-content-harco-reinink.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230127053145/https://www.energycapitalpower.com/top-five-oil-and-gas-projects-in-angola/. Archived from the original on 27 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220720091657/https://www.offshore-mag.com/regional-reports/africa/article/14278028/anpg-totalenergies-invest-850-million-in-phase-3-of-angolan-block-17. Archived from the original on 20 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220521063425/https://www.woodmac.com/reports/upstream-oil-and-gas-block-17-clov-3778214. Archived from the original on 21 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20210917210115/https://www.offshore-mag.com/production/article/16782158/total-starts-clov-oil-production-offshore-angola. Archived from the original on 17 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.annualreports.com/HostedData/AnnualReportArchive/t/NYSE_TOT_2010.pdf.
{{cite web}}
: Missing or empty|title=
(help)