Pu'an power station (中电国际普安发电厂) is an operating power station of at least 1320-megawatts (MW) in Qingshan Town (雪浦乡老地村), Pu' an, Qianxinan AP, Guizhou, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Pu'an power station | Qingshan Town (雪浦乡老地村), Pu' an, Qianxinan AP, Guizhou, China | 25.524752, 104.974836 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 25.524752, 104.974836
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: unknown | 660 | supercritical | 2019 |
Unit 2 | operating | coal: unknown | 660 | supercritical | 2018 |
Unit 3 | cancelled | coal: unknown | 660 | supercritical | – |
Unit 4 | cancelled | coal: unknown | 660 | supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | China Power (Pu'an) Power Generation Co Ltd [100%] | China Power International Development Co Ltd [95.0%]; Qianxinan Industrial Investment (Group) Co Ltd [4.5%]; Guizhou Financial Holding Group Co Ltd (Guizhou Guimin Investment Group Co., Ltd.) [0.5%] |
Unit 2 | China Power (Pu'an) Power Generation Co Ltd [100%] | China Power International Development Co Ltd [95.0%]; Qianxinan Industrial Investment (Group) Co Ltd [4.5%]; Guizhou Financial Holding Group Co Ltd (Guizhou Guimin Investment Group Co., Ltd.) [0.5%] |
Unit 3 | China Power (Pu'an) Power Generation Co Ltd [100%] | China Power International Development Co Ltd [95.0%]; Qianxinan Industrial Investment (Group) Co Ltd [4.5%]; Guizhou Financial Holding Group Co Ltd (Guizhou Guimin Investment Group Co., Ltd.) [0.5%] |
Unit 4 | China Power (Pu'an) Power Generation Co Ltd [100%] | China Power International Development Co Ltd [95.0%]; Qianxinan Industrial Investment (Group) Co Ltd [4.5%]; Guizhou Financial Holding Group Co Ltd (Guizhou Guimin Investment Group Co., Ltd.) [0.5%] |
Background on Project
China Power International Development is planning to build two units of 660 MW each in Guizhou Province.[1] The units are under construction and were planned for operation in June 2017.[2]
The operation date for the two units was later postponed to December 2017.[3]
Unit 2 was commissioned first, in December 2018.[4] Unit 1 was commissioned on January 24, 2019.[5]
Units 3-4
In addition, two more units of 660 MW are planned.[6]
However, there have been no developments on the units since first proposed in May 2016, and plans appear to be cancelled.
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[7]
Articles and Resources
References
- ↑ "贵州普安:“煤电联营”的成功实践,", 北极星电力网, 1/7/2014
- ↑ "中电普安电厂新建工程第一台机组计划2017年6月投产"贵州兴义之窗, 2016-06-17
- ↑ "总投资49.96亿元 中电普安电厂一期2×660MW超临界燃煤发电工程完成投资33亿元"能源界, 2017-10-15
- ↑ "中电普安电厂2号机组完成168小时满负荷试运行," PowerChina, 2018-12-18
- ↑ "中电普安电厂两台新建机组全部投产发电," 国际电力网, 2019-01-29
- ↑ "中电普安电厂2号机组第一个里程牌节点工期--锅炉钢架顺利开吊," 中国电力化工网点击, 2016-05-05
- ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.