Shandong Xinfa Haoji power station (信发信源铝业郝集电厂) is an operating power station of at least 1440-megawatts (MW) in Haoji Town, Chiping, Liaocheng, Shandong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shandong Xinfa Haoji power station Haoji Town, Chiping, Liaocheng, Shandong, China 36.4873847, 116.3332415 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 36.4873847, 116.3332415

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: bituminous 360 supercritical 2011
Phase I Unit 2 operating coal: bituminous 360 supercritical 2012
Phase II Unit 3 operating coal: bituminous 360 supercritical 2014
Phase II Unit 4 operating coal: bituminous 360 supercritical 2014

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Liaocheng Xinyuan Group Co Ltd [100%] Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%]
Phase I Unit 2 Liaocheng Xinyuan Group Co Ltd [100%] Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%]
Phase II Unit 3 Liaocheng Xinyuan Group Co Ltd [100%] Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%]
Phase II Unit 4 Liaocheng Xinyuan Group Co Ltd [100%] Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%]

Project-level captive use details

  • Captive industry use (heat or power): both
  • Captive industry: Aluminum


Background on Project

The power station consists of four units of 350 MW each (or 360 MW based on government sources), owned by Chiping Xinyuan Aluminum.[1][2]

Unit 1 went into operation in December 2011 and unit 2 in January 2012.[3] Unit 3 went into operation in June 2014,[4][5] and Unit 4 in September 2014.[6]