Shandong Xinfa Haoji power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Shandong Xinfa Haoji power station (信发信源铝业郝集电厂) is an operating power station of at least 1440-megawatts (MW) in Haoji Town, Chiping, Liaocheng, Shandong, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shandong Xinfa Haoji power station | Haoji Town, Chiping, Liaocheng, Shandong, China | 36.4873847, 116.3332415 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 36.4873847, 116.3332415
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: bituminous | 360 | supercritical | 2011 |
Phase I Unit 2 | operating | coal: bituminous | 360 | supercritical | 2012 |
Phase II Unit 3 | operating | coal: bituminous | 360 | supercritical | 2014 |
Phase II Unit 4 | operating | coal: bituminous | 360 | supercritical | 2014 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Liaocheng Xinyuan Group Co Ltd [100%] | Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%] |
Phase I Unit 2 | Liaocheng Xinyuan Group Co Ltd [100%] | Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%] |
Phase II Unit 3 | Liaocheng Xinyuan Group Co Ltd [100%] | Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%] |
Phase II Unit 4 | Liaocheng Xinyuan Group Co Ltd [100%] | Chiping Xinyou Enterprise Management Co Ltd [75.0%]; Dongfang Energy (Hong Kong) International Trading [25.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Aluminum
Background on Project
The power station consists of four units of 350 MW each (or 360 MW based on government sources), owned by Chiping Xinyuan Aluminum.[1][2]
Unit 1 went into operation in December 2011 and unit 2 in January 2012.[3] Unit 3 went into operation in June 2014,[4][5] and Unit 4 in September 2014.[6]
Articles and Resources
References
- ↑ “郝集电厂3号锅炉受热面全面开焊,” 中国火力发电网2013-07-22
- ↑ “郝集电厂4#机1x350MW超临界机组四大管道管件招标公告,” 中国采购网2013-12-27
- ↑ "信发集团山东郝集电厂," 2014-02-21
- ↑ “郝集电厂3号机组通过168小时试运行,” 国家核电, 2014-06-02
- ↑ “茌平郝集电厂3号机组顺利移交投产,” 聊城网2014-07-24
- ↑ "山东二建承建茌平郝集电厂四号机组移交商业运行," 中国电建, 2014-09-30