Datang Douhe power station (大唐国际陡河发电厂) is a power station under construction in Ciyutuo Town, Luanzhou, Tangshan, Hebei, China. It is also known as 大唐国际陡河2×660兆瓦燃煤热电联产等容量替代项目, 大唐国际茨榆坨热电, 大唐国际陡河发电厂电联产等容量替代项目 (Unit 1).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Datang Douhe power station Ciyutuo Town, Luanzhou, Tangshan, Hebei, China 39.594794, 118.5066 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 39.594794, 118.5066

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 construction coal: bituminous 660 ultra-supercritical 2023 (planned)
Unit 2 construction coal: bituminous 660 ultra-supercritical 2023 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Datang International Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [100.0%]
Unit 2 Datang International Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [100.0%]

Background

In June 2019 it was reported the 2 x 300 MW Datang Tangshan power station-2 would be relocated to a less populous area, under the new name Datang Tangshan Ciyutuo power station. The new plant will be 2 x 350 MW and located north of the Western District of Quzhou Economic Development Zone in Ciyutuo Town.[1]

In 2021 the planned capacity of the plant was increased to 2 x 660 MW. It is planned for operation in 2023.[2]

No official permit information can be found apart from calls for bidding indicating the permit was granted by the Hebei Provincial Development and Reform Commission in 2022 with permit number 冀发改能源核字〔2022〕25号.[3][4]

The project was on 2023 Hebei Province key construction projects list.[5] Construction started in mid-2023.[6] The project was reportedly being built at Datang Douhe retired units site. China Energy Engineering Corporation Huabei Branch won the bid for the project engineering survey and design.[7] On 4 July 2023, Datang's official Weibo account showed pictures of construction progress of Douhe power station and concrete poured foundation could be seen.[8]

Articles and Resources

References

  1. "大唐河北唐山“退城搬迁”热电联产项目环境影响评价第一次公示," Luanzhou 2019-06-25
  2. "唐山热电公司要搬迁了?来看看!网友:搬迁后外环内还有厂子吗?," 丁梦桐娱乐厅, 2021-03-16
  3. "大唐国际陡河发电厂2X660MW燃煤热电联产等容量替代项目再生水供水管网(城区段、厂区段)工程施工招标公告". 电力招标网. 2023-06-19. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "大唐国际陡河发电厂2X660MW燃煤热电联产等容量替代项目2号机组及相关工程招标". 北极星火力发电网. 2023-03-29. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. "河北省2023年省重点项目建设名单" (PDF). 河北省发改委网站. 2023-1-16. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  6. "2×660MW!大唐国际陡河热电联产等容量替代项目主体施工". 能源电力新观察. 2023-07-23. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  7. "大唐陡河发电厂2×660兆瓦燃煤热电联产等容量替代工程启动". 中国电力网. 2022-07-27. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. "#大唐陡河热电分公司燃煤热电联产项目开工#". Datang Weibo. 2023-7-4. Retrieved 2023-8-30. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)