Datang Douhe power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Datang Douhe power station (大唐国际陡河发电厂) is a power station under construction in Ciyutuo Town, Luanzhou, Tangshan, Hebei, China. It is also known as 大唐国际陡河2×660兆瓦燃煤热电联产等容量替代项目, 大唐国际茨榆坨热电, 大唐国际陡河发电厂电联产等容量替代项目 (Unit 1).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Datang Douhe power station | Ciyutuo Town, Luanzhou, Tangshan, Hebei, China | 39.594794, 118.5066 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 39.594794, 118.5066
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | construction | coal: bituminous | 660 | ultra-supercritical | 2023 (planned) |
Unit 2 | construction | coal: bituminous | 660 | ultra-supercritical | 2023 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Datang International Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Unit 2 | Datang International Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
Background
In June 2019 it was reported the 2 x 300 MW Datang Tangshan power station-2 would be relocated to a less populous area, under the new name Datang Tangshan Ciyutuo power station. The new plant will be 2 x 350 MW and located north of the Western District of Quzhou Economic Development Zone in Ciyutuo Town.[1]
In 2021 the planned capacity of the plant was increased to 2 x 660 MW. It is planned for operation in 2023.[2]
No official permit information can be found apart from calls for bidding indicating the permit was granted by the Hebei Provincial Development and Reform Commission in 2022 with permit number 冀发改能源核字〔2022〕25号.[3][4]
The project was on 2023 Hebei Province key construction projects list.[5] Construction started in mid-2023.[6] The project was reportedly being built at Datang Douhe retired units site. China Energy Engineering Corporation Huabei Branch won the bid for the project engineering survey and design.[7] On 4 July 2023, Datang's official Weibo account showed pictures of construction progress of Douhe power station and concrete poured foundation could be seen.[8]
Articles and Resources
References
- ↑ "大唐河北唐山“退城搬迁”热电联产项目环境影响评价第一次公示," Luanzhou 2019-06-25
- ↑ "唐山热电公司要搬迁了?来看看!网友:搬迁后外环内还有厂子吗?," 丁梦桐娱乐厅, 2021-03-16
- ↑ "大唐国际陡河发电厂2X660MW燃煤热电联产等容量替代项目再生水供水管网(城区段、厂区段)工程施工招标公告". 电力招标网. 2023-06-19. Retrieved 2023-8-30.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "大唐国际陡河发电厂2X660MW燃煤热电联产等容量替代项目2号机组及相关工程招标". 北极星火力发电网. 2023-03-29. Retrieved 2023-8-30.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "河北省2023年省重点项目建设名单" (PDF). 河北省发改委网站. 2023-1-16. Retrieved 2023-8-30.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "2×660MW!大唐国际陡河热电联产等容量替代项目主体施工". 能源电力新观察. 2023-07-23. Retrieved 2023-8-30.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "大唐陡河发电厂2×660兆瓦燃煤热电联产等容量替代工程启动". 中国电力网. 2022-07-27. Retrieved 2023-8-30.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "#大唐陡河热电分公司燃煤热电联产项目开工#". Datang Weibo. 2023-7-4. Retrieved 2023-8-30.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.