This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Cold Springs
Desert Meadow wind farm is an operating wind farm in Elmore County, Idaho, United States.
Project Details
Table 1: Phase-level project details for Desert Meadow wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2012[2] | 23 MW[1] | Onshore[1] | Innergex Renewable Energy [62%]; MetLife [37%][3][3] | Siemens Gamesa Renewable Energy SA (Siemens Gamesa Renewable Energy Siemens Gamesa Ανανεωσιμη Ενεργεια Ανωμυμη Εταιρεια)[3] |
Location
Table 2: Phase-level location details for Desert Meadow wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Elmore County, Idaho, United States[1] | 43.0566, -115.452 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://doi.org/10.5066/F7TX3DN0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240131010517/https://www.innergex.com/sites/desert-meadow/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)