Romania-Ukraine Interconnector is a proposed gas pipeline in Romania and Ukraine with two components.[1][2]
Location
The pipeline would run from Gheraesti, Romania to Khotyn, Ukraine.[1][3]
Project details
Gheraesti-Siret
- Operator: SNTGN Transgaz SA[1]
- Owner: SNTGN Transgaz SA[1]
- Parent Company: Transgaz
- Proposed capacity:
- Length: 146 km / 90.72 mi[1]
- Diameter: 700 mm / 28 inches[4]
- Cost: €125 million (US$142.5 million)[5]
- Status: Proposed[6]
- Start Year: 2026[6]
- ENTSOG 2020 TYNDP Code: TRA-N-596[6]
Siret-Khotyn
- Operator: Gas Transmission System Operator of Ukraine[7]
- Owner: Gas Transmission System Operator of Ukraine[7]
- Parent: JSC "MAHISTRALNI GAZOPROVODY UKRAINY"
- Proposed capacity:
- Diameter: 700 mm / 27 inches[9]
- Length: 30 km / 18.64 miles[7]
- Cost: €40 million (US$45.6 million)[10]
- Status: Proposed[9]
- Start Year: 2025[7]
- ENTSOG 2020 TYNDP Code: TRA-N-502[7]
Background
Together with Siret-Khotyn Gas Pipeline, Gheraesti-Siret Gas Pipeline is a part of the Interconnector Romania - Ukraine project.
The pipeline is listed as the Romanian part of the "interconnection between the RO and the UA gas transmission systems" (TRA-N-596, TRA-N-502) in the European Network of Transmission System Operators for Gas (ENTSOG) 2020 Ten Year Network Development Plan. As of that plan's release, it was expected to be commissioned in 2025.[1]
In its 2018-2027 Network development plan, Transgaz stated that construction would begin in 2022, and the pipeline would begin operating in 2025.[11] However, the 2021-2030 iteration of that document stated that construction would begin in 2023, and the pipeline would begin to operate in 2026.[6]
However, there has been no forward progress on plans for the pipeline, which is not featured in ENTSOG's 2022 TYNDP.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 European Network of Transmission System Operators for Gas (November 25, 2020). "TYNDP 2020 Annex A.2 – Project Tables". ENTSOG. Retrieved December 2, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ European Network of Transmission System Operators for Gas (July 10, 2020). "Current TYNDP : TYNDP 2020 - Annex A" (PDF). ENTSOG. Retrieved August 31, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ European Network of Transmission System Operators for Gas (October 2020). "TYNDP Transmission Map" (PDF). ENTSOG. Retrieved December 3, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ European Network of Transmission System Operators for Gas (November 25, 2020). "TYNDP 2020 Annex A.2 – Project Tables". ENTSOG. Retrieved December 2, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Ten Year Network Development Plan 2020 - Annex A - Projects Tables, ENTSOG, accessed Dec. 1, 2021
- ↑ 6.0 6.1 6.2 6.3 SNTGN TRANSGAZ SA MEDIAŞ (2021). "PLANUL DE DEZVOLTARE A SISTEMULUI NAȚIONAL DE TRANSPORT GAZE NATURALE" (PDF). Tranzgaz. Retrieved August 31, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 7.0 7.1 7.2 7.3 7.4 European Network of Transmission System Operators for Gas (July 10, 2020). "Current TYNDP : TYNDP 2020 - Annex A" (PDF). ENTSOG. Retrieved August 31, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 8.0 8.1 ОПЕРАТОР ГТС УКРАЇНИ (March 17, 2020). "ПЛАН РОЗВИТКУ ТОВ "ОПЕРАТОР ГТС УКРАЇНИ" 2020 – 2029" (PDF). tsoua.com. Retrieved September 22, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 9.0 9.1 Projects Tables, European Network of Transmission System Operators for Gas (ENTSOG), August 13 2020
- ↑ Ten Year Network Development Plan 2020 - Annex A - Projects Tables, ENTSOG, accessed Dec. 14, 2021
- ↑ SNTGN TRANSGAZ SA MEDIA? (2018). "PLANUL DE DEZVOLTARE A SISTEMULUI NATIONAL DE TRANSPORT GAZE NATURALE 2018-2027" (PDF). Transgaz. Retrieved August 31, 2021.
{{cite web}}
: CS1 maint: url-status (link)