Goleniów–Płoty Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Goleniów–Płoty Gas Pipeline is a proposed gas pipeline in Poland.[1]

Location

The project is located in Zachodniopomorskie Voivodeship in the Goleniów and Gryfice districts, in the communes of: Goleniów, Osina, Nowogard, Płoty.[1]

Loading map...

Project details

  • Operator: Gaz-System
  • Owner: Gaz-System
  • Parent: Gaz-System
  • Capacity: 27.5 inches
  • Length: 41 kilometres
  • Diameter: 700 mm
  • Cost: €27 million (US$30.7 million)[2]
  • Financing:
  • Status: Construction[1]
  • Start year: 2022[3]

Background

Gaz-system reports that the permit for this pipeline was received in 2017, with construction being completed in the 4th quarter of 2021. Tests have since been done, with the final commissioning expected toward the end of 2022.[4]

Articles and resources

References

  1. 1.0 1.1 1.2 "GOLENIÓW-PŁOTY DN700". Retrieved 2021-09-27.{{cite web}}: CS1 maint: url-status (link)
  2. Rafako zbuduje gazociąg Goleniów-Płoty, Biznes Alert, Jun. 1, 2018
  3. www.gaz-system.pl https://www.gaz-system.pl/en/transmission-system/investment-projects/other-major-investment-projects/goleniow-ploty.html. Retrieved 2022-07-14. {{cite web}}: Missing or empty |title= (help)
  4. www.gaz-system.pl https://www.gaz-system.pl/en/transmission-system/investment-projects/other-major-investment-projects/goleniow-ploty.html. Retrieved 2022-07-14. {{cite web}}: Missing or empty |title= (help)

Related GEM.wiki articles

External resources

External articles