Jiangsu Energy Group Wulagai power station (江苏能源乌拉盖2x1000MW高效超超临界全国首台百万褐煤发电机组, 江苏能源乌拉盖发电厂) is a power station under construction in Ulgai District, East Ujimqin, Xilingol, Inner Mongolia, China. It is also known as Guodian Mengneng Xilinguole Wulagai Power Plant.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jiangsu Energy Group Wulagai power station Ulgai District, East Ujimqin, Xilingol, Inner Mongolia, China 45.955947, 119.106454 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 45.955947, 119.106454

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 construction coal: lignite 1000 ultra-supercritical 2025 (planned)
Unit 2 construction coal: lignite 1000 ultra-supercritical 2025 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Suneng (Xilinguole) Power Generation Co Ltd [100%] Jiangsu Xukuang Energy Co Ltd [100.0%]
Unit 2 Suneng (Xilinguole) Power Generation Co Ltd [100%] Jiangsu Xukuang Energy Co Ltd [100.0%]

Background on Project

China Guodian is planning to build a coal-fired power plant with a total planned capacity of 2,000 MW in Inner Mongolia Autonomous Region. The project feasibility study began in 2011.[1][2][3][4]

2016: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

2019: Project revived

In December 2019 it was reported that an EIA had been submitted for the project. The plant sponsor was now Jiangsu Energy Investment Group of the Xuzhou Mining Group.[5]

In September 2020, the plant was permitted for construction.[6] The location of the plant has not been determined by the end of 2020, but will be 1.1 kilometers away from the Hesigewula South surface mine, which will also be its integrated coal supplier.[7][5]

Construction began in November 2021.[8]

Articles and Resources

References

  1. "国电乌拉盖电厂一期工程可研报告通过审查", 内蒙古网群,锡林郭勒,新闻专区,2011-04-27
  2. "自治区发改委同意乌拉盖电厂示范项目开展前期工作", 锡林郭勒盟发展和改革委员会, 2011-05-17
  3. "1—7月份重点项目进展情况", 乌拉盖管理区发展和改革局, 2014-08-11
  4. "国家能源局电力司司长韩水赴乌拉盖调研," 高雪峰, 2015-05-12
  5. 5.0 5.1 "江苏能源乌拉盖2×1000MW超超临界燃煤发电机组工程环评文件第一次公示," 乌拉盖管理区发改委, 2019/12/27
  6. "徐矿集团投资内蒙古项目取得突破," Xinhua Net, 2020年09月14日
  7. 锡林郭勒盟乌拉盖电厂预选址地勘工作启动 12-15-2020, The Paper, 澎湃新闻. 来源:《锡林郭勒日报》
  8. "江苏能源乌拉盖2×100万千瓦电厂项目已开工," 北极星电力网新闻中心, 2021/12/29