This article is part of the Global Cement and Concrete Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Hover Cement Plant (Hover Zementwerk) is an integrated cement plant operating in Sehnde, Niedersachsen, Germany.
Location
The map below shows the exact location of the cement plant in Sehnde, Niedersachsen, Germany[1]:
Coordinates (WGS 84): 52.353420, 9.888530 (exact)[2]
Background
In 2021, owner Holcim signed a contract to provide their Lagerdorf and Hover cement plants with 30,000MWh of offshore wind power. Also in 2021, Holcim signed a memorandum of understanding with Holcim Deutschland to deliver a carbon capture system for a carbon capture and storage trial. The system was installed by Cool Planet Technologies based on Hereon’s PolyActive membrane technology, and ran from 2022-2023, with subsequent expansions planned for 2024 and 2026. In 2024, Cool Planet Technologies raised €23.7m in funding to support the development of Cool Planet's ‘low-energy, low-cost’ membrane-based carbon capture technology. It will also go towards the construction of a new membrane manufacturing facility at the Höver cement plant.
Cement Plant Details
Table 1: General Plant Details
Plant type | Plant status | Start date |
---|---|---|
integrated[3] | Operating[3] | 1908[3] |
Table 2: Ownership Details
Parent company | Parent company GEM ID | Owner name | Owner company GEM ID |
---|---|---|---|
Holcim AG [100.0%] | E100001000571 [100.0%] | Holcim Germany AG [100%] (Holcim Deutschland AG (German) [100%])[3] | E100002006800 [100.0%] |
Table 3: Capacities
Cement capacity (million metric tonnes per annum) | Clinker capacity (million metric tonnes per annum) | Unspecified capacity (million metric tonnes per annum) |
---|---|---|
1[3] | 0.8[3] | – |
Table 4: Cement Production
Primary cement color | Primary cement type | Production type | Green cement technology |
---|---|---|---|
grey[4] | blended[3] | dry[3] | Carbon capture, utilization, and/or storage [5]; Alternative fuels [3] |
Articles and Resources
Additional data
To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20250215004440/https://www.holcim.de/ueber-uns/standorte/zementwerk-hoever. Archived from the original on 15 February 2025.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/52%C2%B021'12.3%22N+9%C2%B053'18.7%22E/@52.3534199;9.8859529;931m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d52.3534167!4d9.8885278?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://www.holcim.de/ueber-uns/standorte/zementwerk-hoever/zementproduktion-in-hoever.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.holcim-sued.de/de/produkte-loesungen/zement.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.globalcement.com/news/item/16065-holcim-deutschland-secures-government-funding-for-hoever-cement-plant-carbon-capture-project.
{{cite web}}
: Missing or empty|title=
(help)