Shijiazhuang Luhua cogen power station (华电石家庄鹿华热电, 河北省华电石家庄鹿华二期天然气热电联产项目) is an operating power station of at least 660-megawatts (MW) in Luquan District, Shijiazhuang, Hebei, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shijiazhuang Luhua cogen power station | Luquan District, Shijiazhuang, Hebei, China | 38.051558, 114.317738 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 38.051558, 114.317738
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Cancelled inferred May 2024) | fossil gas: natural gas[3][4] | 400[5][6] | combined cycle[5] | yes[7] | – |
2 | Cancelled inferred May 2024) | fossil gas: natural gas[3] | 400[5] | combined cycle[5] | yes[7] | – |
Phase I Unit 1 | Operating | coal: anthracite | 330 | subcritical | – | 2011 |
Phase I Unit 2 | Operating | coal: anthracite | 330 | subcritical | – | 2011 |
Phase II Unit 3 | Cancelled | coal: unknown | 350 | supercritical | – | – |
Phase II Unit 4 | Cancelled | coal: unknown | 350 | supercritical | – | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Hebei Huadian Shijiazhuang Luhua Thermal Power Co Ltd [100%][2] | Huadian Power International Co Ltd [90.0%]; Shijiazhuang Guokong Urban Development Investment Group Co Ltd [10.0%] |
2 | Hebei Huadian Shijiazhuang Luhua Thermal Power Co Ltd [100%][2] | Huadian Power International Co Ltd [90.0%]; Shijiazhuang Guokong Urban Development Investment Group Co Ltd [10.0%] |
Phase I Unit 1 | Hebei Huadian Shijiazhuang Luhua Thermal Power Co Ltd [100%][2] | Huadian Power International Co Ltd [90.0%]; Shijiazhuang Guokong Urban Development Investment Group Co Ltd [10.0%] |
Phase I Unit 2 | Hebei Huadian Shijiazhuang Luhua Thermal Power Co Ltd [100%][2] | Huadian Power International Co Ltd [90.0%]; Shijiazhuang Guokong Urban Development Investment Group Co Ltd [10.0%] |
Phase II Unit 3 | Hebei Huadian Shijiazhuang Luhua Thermal Power Co Ltd [100%][2] | Huadian Power International Co Ltd [90.0%]; Shijiazhuang Guokong Urban Development Investment Group Co Ltd [10.0%] |
Phase II Unit 4 | Hebei Huadian Shijiazhuang Luhua Thermal Power Co Ltd [100%][2] | Huadian Power International Co Ltd [90.0%]; Shijiazhuang Guokong Urban Development Investment Group Co Ltd [10.0%] |
Background
The power station is different from the Huadian Shijiazhuang Cogen power station and Huadian Shijiazhuang Yuhua Cogen power station.
The two existing coal-fired units of Luhua power station, totaling 660 MW, were brought online in 2011. The plant is owned by China Huadian.[8][9]
Description of Expansion
Huadian was planning to build two additional coal-fired units at this plant, with a total planned capacity of 700 MW.[10][11][12]
In February 2017 the coal-fired units were cancelled, and are being proposed as gas-fired units instead.[13] It was permitted in 2017, and planned construction in August 2018.[14][15]
Articles and Resources
References
- ↑ (PDF) https://web.archive.org/web/20210604204123/http://xzspj.sjz.gov.cn/u/cms/www/201803/27152609jb79.pdf. Archived from the original (PDF) on 04 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://slj.sjz.gov.cn/columns/b5c4741c-e08a-40cc-9ab8-b8b066bb8f5f/202108/05/257b5e0e-e8c1-42e9-9f9a-2c92f34ead2c.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20210605002718/https://news.bjx.com.cn/html/20170228/810961.shtml. Archived from the original on 05 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240515202744/http://www.zgdlhg.com/xwzx/qyxw/2017030149295.html. Archived from the original on 15 May 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 (PDF) https://web.archive.org/web/20210604180733/http://xzspj.sjz.gov.cn/u/cms/www/201803/27152559r56m.pdf. Archived from the original (PDF) on 04 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240205032629/http://www.chinapower.com.cn/fdqyfc/20170913/90622.html. Archived from the original on 05 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20210731081146/http://www.chd.com.cn/webfront/webpage/web/contentPage/id/4b8f4cac2e4248e593f9cdd3db3fb2f1. Archived from the original on 31 July 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "鹿华公司2号机组顺利通过168小时试运行",中国华电集团, 2011-12-28
- ↑ "鹿华热电一期工程1号机组顺利通过168小时试运行(图),中国华电集团, 2011-10-27
- ↑ "河北华电石家庄鹿华热电有限公司二期2×350MW空冷供热机组工程环境影响评价信息第一次公示," hebhb.gov.cn, accessed July 2015
- ↑ "河北华电2个热电项目环境影响评价信息公示," 2015-03-20
- ↑ "河北华电石家庄裕华热电有限公司二期2×350MW热电项目环境影响评价信息第一次公示," accessed July 2015
- ↑ "鹿华公司二期天然气热电联产项目取得“小路条,” 鹿华热电有限公司, 2017-02-28
- ↑ "华电河北公司砥砺奋进的五年"中国电力网, 2017-9-21
- ↑ "2018中国华电集团河北公司招聘简介"OFFCN, 2018-01-16
Additional data
To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Coal Plant Tracker and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.