Huainan Luohe power station (大唐淮南洛河发电厂) is an operating power station of at least 2500-megawatts (MW) in Luohe, Datong, Huainan, Anhui, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Huainan Luohe power station Luohe, Datong, Huainan, Anhui, China 32.68455, 117.07511 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 32.68455, 117.07511

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: bituminous 320 subcritical 1985
Phase I Unit 2 operating coal: bituminous 320 subcritical 1986
Phase II Unit 3 operating coal: bituminous 300 subcritical 1998
Phase II Unit 4 operating coal: bituminous 300 subcritical 1999
Phase III Unit 5 operating coal: bituminous 630 supercritical 2007
Phase III Unit 6 operating coal: bituminous 630 supercritical 2007
Phase IV Unit 7 permitted coal: bituminous 1000 ultra-supercritical
Phase IV Unit 8 permitted[1] coal: unknown 1000[1] ultra-supercritical[1]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Datang Anhui Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [100.0%]
Phase I Unit 2 Datang Anhui Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [100.0%]
Phase II Unit 3 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; other [1.2%]
Phase II Unit 4 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; other [1.2%]
Phase III Unit 5 Anhui Huainan Luoneng Power Generation Co Ltd [100%][2][3] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; other [1.2%]
Phase III Unit 6 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; other [1.2%]
Phase IV Unit 7 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; other [1.2%]
Phase IV Unit 8 Anhui Huainan Luoneng Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [52.8%]; An Hui Wenergy Co Ltd [46.0%]; other [1.2%]

Project-level coal details

Background

The six existing coal-fired units of Huainan Luohe power station, totaling 2,500 MW, were brought online between 1985 and 2010 in three phases. The plant is owned by China Datang.[5][6][7][8]

In 2010, two 600 MW units were upgraded to 630 MW each.[9] As of 2014, the configuration of the plant was as follows:[10][11]

  • Unit 1 - 300 MW - operating 1985 (subcritical)
  • Unit 2 - 300 MW - operating 1986 (subcritical)
  • Unit 3 - 300 MW - operating 1998 (subcritical)
  • Unit 4 - 300 MW - operating 1999 (subcritical)
  • Unit 5 - 600 MW - operating 2007 (supercritical) - upgraded to 630 MW in 2010
  • Unit 6 - 600 MW - operating 2007 (supercritical) - upgraded to 630 MW in 2010

Description of Phase IV Expansion

As of November 2012, Datang was planning to build an additional 1,000-MW coal-fired unit.[5] A feasibility study was carried out in 2011.[12][12][13][13][14]

However, there had been no news on the project since its 2011 feasibility study, and it appeared to be deferred or abandoned.

In August 2023, the Phase IV proposal was revived, now with 2 x 1,000 MW units. The announcement stated that when the Phase IV units were operational, the 2 x 320 MW Phase I would be retired.[15]

In November 2023, Phase IV was approved by the Provincial Development and Reform Commission.[16]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 https://fzggw.ah.gov.cn/public/7011/148796261.html. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240219011832/https://mp.weixin.qq.com/s/TfRWmMC9PHpQhpMCgEzlCg. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240219011823/https://mp.weixin.qq.com/s/Ec7k4_BPzom0L_9gYXEuxw. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240125152136/https://fgw.huainan.gov.cn/gzdt/551735212.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
  6. Datang Huainan Luohe Power Plant China, Global Energy Observatory, accessed 2014-11.
  7. Huainan Luohe Powerplant, Enipedia, accessed 2014-11.
  8. Datang Huainan Luohe Power Plant (大唐淮南洛河发电厂), EMIS, accessed 2014-11.
  9. "大唐淮南洛河发电厂简介," China Datang, accessed November 2014
  10. “大唐淮南洛河电厂三期2×600MW机组举行开工仪式,” 安徽新闻 2005-09-09
  11. “大唐洛河发电厂三期工程通过竣工环境保护验收,” 中国电力 2009-12-25
  12. 12.0 12.1 “大唐淮南洛河发电厂四期扩建1×100万千瓦机组工程,” 中国淮南 accessed September 2014
  13. 13.0 13.1 “大唐淮南洛河发电厂四期1×1000MW机组工程项目,” 安徽招标网 2011-10-18
  14. “大唐淮南洛河发电厂四期扩建1×100万千瓦机组工程,” 中国淮南 accessed September 2014
  15. “安徽淮南洛能发电有限责任公司淮南洛河电厂四期2×1000MW煤电项目环境影响评价第一次公示,” sthjj.huainan.gov, August 15, 2023
  16. “我市洛河电厂四期2×1000MW煤电项目获省发展改革委批复,” fgw.huainan.gov, November 14, 2023