Datang Yan'an power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Datang Yan'an power station (大唐延安发电公司) is an operating power station of at least 1320-megawatts (MW) in Jizixian Town, Fu, Yan'an, Shaanxi, China with multiple units, some of which are not currently operating. It is also known as Huaneng Yan'an power station (before ownership change), 华能延安发电厂.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Datang Yan'an power station Jizixian Town, Fu, Yan'an, Shaanxi, China 35.82674, 109.302072 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 35.82674, 109.302072

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating[1][2][3] coal: bituminous 660 ultra-supercritical 2023[2][3]
Phase I Unit 2 operating[4][5] coal: bituminous 660 ultra-supercritical 2024[4][2]
Phase II Unit 3 permitted[6] coal: unknown 1000[7] ultra-supercritical[8]
Phase II Unit 4 permitted[8] coal: unknown 1000[7] ultra-supercritical[8]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Datang Yanan Power Generation Co Ltd [100%] China Datang Corp [100.0%]
Phase I Unit 2 Datang Yanan Power Generation Co Ltd [100%] China Datang Corp [100.0%]
Phase II Unit 3 Datang Yanan Power Generation Co Ltd [100%] China Datang Corp [100.0%]
Phase II Unit 4 Datang Yanan Power Generation Co Ltd [100%] China Datang Corp [100.0%]

Project-level coal details

  • Coal source(s): 陕西靖边海则滩煤矿
  • Permit(s): [9]

Background on Project

In 2010, Huaneng reported that it was planning a 3,200 MW project in Yan'an in two phases, 1,200 MW in Phase I and 2,000 MW in Phase II.[10][11]

In 2015 it was reported the power station would consist of four units of 660 MW each.[12]

In 2015 a feasibility report was submitted for the first two units.[13] Units 1-2 were approved for construction in 2015,[14] and began construction in 2016.[15]

Units 1-2 suspended

In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects with a total capacity of over 100GW in 13 provinces, including Yan'an power station units 1-2. It is unclear when or if the projects will be revived.[16]

Construction on units 1-2 resumes

An announcement dated March 22, 2017, indicated that the company continued to recruit new employees for the project.[17]

In August 2017, it was reported that construction on units 1-2 of the plant was ongoing. China Huaneng claimed the project was in a revolutionary area,[18] which would be exempt under China's restrictions on new coal capacity.

Planet satellite images show limited construction from June 2017 through April 2018.

A groundbreaking ceremony was held in December 2018.[19] The two units are planned for commissioning in 2020.[20]

After one year of construction and 1.4 billion Yuan investment (of the total 4.9 billion Yuan budget), the project was once again stopped in 2020 for unknown reasons.[21]

In August 2022, bidding was once again opened for the 2 x 660 MW project.[22]

In November 2023, Unit 1 began operating.[23] In December 2023, Unit 2 was successfully connected to the grid and preparing to enter trial operation.[24]

Units 3-4

With no developments on Units 3-4 since August 2015, the Phase II project appeared to be cancelled as of 2022.

However, in May 2023, plans for the 2 x 1,000 MW expansion were revived.[25] In December 2023, the units were permitted by the Shaanxi Provincial Development and Reform Commission.[26]

Articles and Resources

References

  1. https://web.archive.org/web/20240125143654/https://news.bjx.com.cn/html/20231122/1344955.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125143643/https://news.bjx.com.cn/html/20220322/1212011.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240125153134/https://news.bjx.com.cn/html/20231218/1350490.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240329040933/https://news.bjx.com.cn/html/20240122/1357128.shtml. Archived from the original on 29 March 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125143724/https://mp.weixin.qq.com/s/DD5hfET6P-AKwSt2uuicyg. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240125143722/https://www.chinabiddingzb.com/read-401370957.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 http://www.yanan.gov.cn/gk/fdzdgknr/zdxm/sphzbaxx/1712666605122568194.html. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20240125143730/http://www.bhi.com.cn/Projects/Project_Details.aspx?id=20230928045645822. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240207001425/https://news.bjx.com.cn/html/20231229/1353029.shtml. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. "华能延安电厂筹建处", 中国华能集团公司, 2010-10-17
  11. "华能延安电厂难越“政策红线”搁浅三年欲“求生”", 每经网, 2012-05-25
  12. "华能延安电厂项目前期建设启动仪式在富县隆重举行," 2015-08-04
  13. "华能延安电厂一期(2×660MW)工程环境影响评价第二次公众参与信息公示," 2015-4-24
  14. "陕西省环保厅拟审批华能延安电厂一期(2×660MW)工程," Shaanxi Province DEP, June 13, 2016
  15. "东方电气签订华能延安电厂2×660MW机组工程三大主机供货合同," 东方电气股份有限公司, 2016-12-20
  16. "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
  17. "2017华能延安发电有限公司招聘17人公告," Shaanxi Personnel Examination Center, March 22, 2017
  18. "华能延安电厂:快马加鞭确保2019年底投产发电," Sohu, 2017-08-23
  19. "华能延安电厂两台660兆瓦高效超临界间接空冷燃煤发电机组工程举行开工仪式," 北极星电力网新闻中心, 2018/12/19
  20. "华能延安电厂两台660兆瓦高效超临界间接空冷燃煤发电机组工程举行," China 5e, Dec 19, 2018
  21. "卡壳12年,华能延安百亿电厂项目投产临近又搁浅," Sina, June 18, 2020
  22. 大唐延安电厂2台660MW机组工程3个招标, news.bjx.com, August 23, 2022
  23. 大唐延安发电2×660MW项目1号机组首次并网一次成功, news.bjx.com, November 30, 2023
  24. 大唐延安电厂2×660MW工程项目2号机组并网一次成功, news.bjx.com, December 21, 2023
  25. 延安市行政审批服务局关于大唐延安电厂二期2x1000MW扩建工程 社会稳定风险评估报告的批复, spj.yanan.gov, May 5, 2023
  26. 大唐延安发电火电二期2×1000MW扩建项目获核准, news.bjx.com, December 29, 2023

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.