JK3 wind farm

From Global Energy Monitor
(Redirected from Irraipa wind farm)
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Jemeiwaa Kai, Irraipa

JK3 wind farm (Parque Eólico Irraipa) is a wind farm in pre-construction in Uribia, La Guajira, Colombia.

Project Details

Table 1: Phase-level project details for JK3 wind farm

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 99 MW[2] Onshore[1] AES Corp [100%][1] AES[1]

Location

Table 2: Phase-level location details for JK3 wind farm

Location Coordinates (WGS 84)
Uribia, La Guajira, Colombia[2] 11.9917, -71.6769 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240125171540/https://www.portafolio.co/negocios/aes-colombia-compra-el-parque-eolico-mas-grande-de-la-nacion-526886. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.