JV County Fengyuan cogen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
JV County Fengyuan cogen power station (莒县丰源热电) is an operating power station of at least 700-megawatts (MW) in JV County, Rizhao, Shandong, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
JV County Fengyuan cogen power station | JV County, Rizhao, Shandong, China | 35.627929, 118.848185 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Former Unit 1, Former Unit 2, Former Unit 3: 35.627929, 118.848185
- Unit 1, Unit 2: 35.626963, 118.847079
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Former Unit 1 | retired[2] | coal: unknown | 30[2][3] | CFB[1] | 2016[1] | 2023[2] |
Former Unit 2 | retired[2] | coal: unknown | 30[2] | CFB[1] | 2020[1] | 2023[2][3] |
Former Unit 3 | retired[2] | coal: unknown | 30[2] | CFB[1] | 2017[1] | 2023[2][3] |
Unit 1 | operating[4] | coal: unknown | 350[4] | supercritical[4] | 2023[4][5] | – |
Unit 2 | operating[4] | coal: unknown | 350[4] | supercritical[4] | 2023[4][5] | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Former Unit 1 | Juxian Fengyuan Thermal Power Co Ltd [100%] | Haoyu Group Co Ltd [54.5%]; natural person(s) [19.6%]; Juxian Urban Construction Investment Group Co Ltd [19.0%]; Agricultural Development Bank of China [6.9%] |
Former Unit 2 | Juxian Fengyuan Thermal Power Co Ltd [100%] | Haoyu Group Co Ltd [54.5%]; natural person(s) [19.6%]; Juxian Urban Construction Investment Group Co Ltd [19.0%]; Agricultural Development Bank of China [6.9%] |
Former Unit 3 | Juxian Fengyuan Thermal Power Co Ltd [100%] | Haoyu Group Co Ltd [54.5%]; natural person(s) [19.6%]; Juxian Urban Construction Investment Group Co Ltd [19.0%]; Agricultural Development Bank of China [6.9%] |
Unit 1 | Juxian Fengyuan Thermal Power Co Ltd [100%] | Haoyu Group Co Ltd [54.5%]; natural person(s) [19.6%]; Juxian Urban Construction Investment Group Co Ltd [19.0%]; Agricultural Development Bank of China [6.9%] |
Unit 2 | Juxian Fengyuan Thermal Power Co Ltd [100%] | Haoyu Group Co Ltd [54.5%]; natural person(s) [19.6%]; Juxian Urban Construction Investment Group Co Ltd [19.0%]; Agricultural Development Bank of China [6.9%] |
Project-level coal details
- Permit(s): [5]
Background on Project
The JV County Fengyuan cogen power station appeared to involve small units that are now retired, including coal units 5, 6, and 7. The 6 MW unit 5 was on the 2019 Shandong retirement list[6] and the 12 MW units 6 and 7 were on the 2022 Shandong retirement list.[7] Three 30 MW CFB units were started construction at the site in 2012[8][9] but no operation starting date could be found. Planet imagery in mid-April 2015 showed the units were in operation. These three CFB units were retired in 2023 announced by the Shandong Provincial Energy Bureau in September 2023.[10][11]
According to 2017 reporting, a proposed 2 x 350 MW coal-fired power station was proposed in JV County, Rizhao, by Haoyu Materials Group, as a CHP project for residential heating.[12]
The project's Environmental Impacts Assessment was rejected by the Shandong Provincial EPA in January 2017.[13] Despite lacking a permit, in April 2017 there was news that construction had begun on the power station.[14]
In August 2017, the project was fined 300,000 RMB (US$45,000) for its violation of EIA procedures.[15]
Planet satellite imagery through April 2018 suggested the plant was nearing completion.
In September 2019, it was reported that the boiler of Unit 1 was "successfully ignited" once.[16]
News from May 2020 confirmed construction was complete, but did not indicate an operating date.[17][18]
In December 2022, it was reported that the cogeneration project involved a total investment of 2.97 billion yuan for two 350 MW condensing steam turbine generator sets, two 1167t/h supercritical coal-fired boilers, and related equipment planned for operation in January 2023.[19]
Planet satellite imagery from 2016 to 2023 showed two units that looked complete by 2020 and started operation since around 25 March 2023. Part of the electricity transmission lines was built before permission was granted and its environmental impact assessment was only passed in March 2023.[20]
Haoyu Materials Group and other violations
In 2014 and again in 2016, the power station's sponsor Haoyu Materials Group was fined by the Provincial EPA over pollution violations at its facilities.[21]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) http://sthj.shandong.gov.cn/zwgk/spq/201411/W020141117353930452960.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20240125124915/https://news.bjx.com.cn/html/20230906/1330313.shtml. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240125125032/https://mp.weixin.qq.com/s/v24htWsWot-KLLHQh15VfA. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20240125125540/https://news.bjx.com.cn/html/20190912/1006737.shtml. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 http://fgw.shandong.gov.cn/art/2023/2/15/art_102383_10403218.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21台机组!山东省2019年燃煤机组关停名单发布, BJX, 2020-01-02
- ↑ 关于山东省2022年淘汰关停燃煤机组的公示, shandong.gov.cn, 2023-1-18
- ↑ "014年11月14日建设项目环评文件受理公示". 山东省生态环境厅. 2014-11-17. Retrieved 2023-9-6.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "莒县丰源热电有限公司搬迁工程环境影响报告书" (PDF). 山东省生态环境厅. 2014-11-17. Retrieved 2023-9-6.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "淄博、日照、济宁、德州、聊城市2023年淘汰关停燃煤机组名单公示". 山东省能源局. 2023-09-06. Retrieved 2023-9-6.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "7家电厂、15台煤电机组,关停!". 北极星电力网. 2023-09-06. Retrieved 2023-9-6.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "总投资23亿元 莒县丰源热电2×350MW热电联产工程顺利推进," 北极星电力网新闻中心, 2017/4/7
- ↑ "日照某明星企业,你再得瑟啊," Jan 19, 2017
- ↑ "山东日照一家族企业带头制造雾霾且屡教不改," May 22, 2017
- ↑ "017年行政处罚信息公开(8.9)," Juxian County 0125-01-2017-000171, 2017-08-09
- ↑ 2×350MW!山东莒县热电联产工程1号机组锅炉点火一次成功, BJX, 2019-09-12
- ↑ 浩宇集团:生产经营稳步提升 实现高质量发展, Sohu, 2020-05-07
- ↑ 山东莒县丰源热电工程2号机组倒送电一次成功, CEEC, 2019-04-28
- ↑ 日照市80个能源保障网重点项目1-11月已完成投资54.2亿元, Sina, 2022-12-16
- ↑ "莒县行政审批服务局关于莒县丰源热电有限公司2×350MW热电联产工程送出工程(至招贤段)环境影响报告已批准公告". 莒县人民政府网站. 2023-03-03. Retrieved 2023-9-6.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "5次通报挂牌督办 为何管不住一家污染企业," 中国经济网作, 2014-11-17
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.