This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Kongora Coal Mine is a cancelled coal mine in Tomislavgrad, Canton 10, Bosnia and Herzegovina.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Kongora Coal Mine | Tomislavgrad, Canton 10, Bosnia and Herzegovina | 43.648056, 17.333333 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Cancelled | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
0 | – | – | Underground | – | – | 494* | * |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
129 | – | 206 | – | Lignite | Thermal | Kongora Thermal Power Plant |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Elektroprivreda HZHB Mostar dd | Government of the Federation of Bosnia and Herzegovina [90.0%]; others [10.0%] | Bosnia and Herzegovina |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
The Kongora coal mine was a proposed UNDERGROUND mine in Canton 10, Bosnia and Herzegovina.
The mine project intended to supply coal to Kongora Thermal Power Plant, considered cancelled (as of 2022). The lignite deposit was explored to fuel the proposed mine-mouth Kongora Thermal Power Plant. The power station proposal was investigated by Elektroprivreda Hrvatske zajednice Herceg Bosne (Elektroprivreda HZHB), a publicly owned power utility in Bosnia and Herzegovina.[1]
The proposed plant cost 1.1 billion euros near Tomislavgrad. Elektroprivreda HZHB estimated that the plant would require approximately 3.6 million tonnes of lignite a year from the as yet undeveloped adjoining Kongora lignite deposit.[2]
- Owner: Elektroprivreda HZHB
- Parent: Elektroprivreda HZHB
- Location: Tomislavgrad, Bosnia and Herzegovina
- Coordinates: 43.64611,17.33139 (approximate)
- Status: Cancelled
- Production capacity: 0.4 million tonnes per annum
- Total Reserves: 206 Mt (2008)[3]
- Mineable Reserves: 126 Mt (2008)[3]
- Coal Type: LIGNITE (Thermal)
- Mine Type: UNDERGROUND[4]
- Start Year:
- Source of Financing:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ Elektroprivreda HZHB, "2006 Annual Report", Elektroprivreda HZHB, June 2007, page 14.
- ↑ Elektroprivreda HZHB, "2006 Annual Report", Elektroprivreda HZHB, June 2007, page 34.
- ↑ 3.0 3.1 "Energy Sector Study - Coal Mines (page 30 reserves)" (PDF). www.eihp.hr.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "INTEGRATED GEOLOGICAL EXPLORATION TO POWER GENERATION PLANT. CASE STUDY: KONGORA COAL DEPOSIT". sgem.org. 2015.
{{cite web}}
: CS1 maint: url-status (link)