Kusmunda Coal Mine

From Global Energy Monitor
(Redirected from Kusmunda coal mine)
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Kusmunda Coal Mine is an operating coal mine in Korba, Chhattisgarh, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Kusmunda Coal Mine Korba, Chhattisgarh, India 22.332635, 82.666666 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[1] 1978[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
50[2] 43.5[2] 2022[2] Surface Open Pit 18.54 50* 2017

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
713.24[1] 2022[1] 1105 Korba Lignite Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
South Eastern Coalfields Ltd Coal India Ltd [100.0%] India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 26[3] 40[3] 42[3] 37[4] 28[5] 43[6] 49[6]


Expansion/Extension

Table 6: Project status

* Added capacity of a coal mine refers to the enhancement in the mine's production capabilities beyond its initial production capacity.
Status Status Detail Project Type Project Phase Added Capacity (Mtpa)* Start Year
Proposed Pre-Permit Expansion Stage 2

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

The Kusmunda coal mine is an open cast mine complex, operated by South Eastern Coalfields Limited, a subsidiary of Coal India, with a capacity of 62.5 million tonnes-per-annum (MTPA) in Korba, Chhattisgarh, India.[7] South Eastern Coalfields Limited (SECL), a subsidiary of Coal India operates the Kusmunda coal mine, which opened in 1979.

The mine is located in the south-central part of Korba Coalfields, and is a part of Eastern Sector of Jatraj, Resdi, and Sonpuri Blocks.

Expansion

The mine has rapidly scaled-up capacity since 2009 when the mine produced 10 million tonnes per year.

In February 2014, India's Ministry of Environment, Forest, and Climate Change granted environmental clearance (EC) to SECL to expand the mine's capacity from 15 MTPA to 18 MTPA.[12]

In 2015, SECL put forth another proposal to expand the capacity of the mine (despite reports that the mine was already operating above capacity without an appropriate EC), and in February 2016, the project was granted EC to expand capacity from 18.75 MPTA to 26 MTPA.[13]

In December 2017, in an effort to "meet the country's demand for coal," SECL again applied for an expansion to nearly double the production from 26 MTPA to 50 MTPA (normative) and 62.5 MTPA (peak). The government granted permission in July 2018 amidst protests. An additional mine lease area of 1127.588 hectares would be required for this expansion, thus bringing the Kusmunda mine's total land to 3510.348 hectares.[8] This project is planned to occur in two stages: during phase I, mining will increase over the existing land area of 1655.825 hectares, whereas during phase II, mining will increase over additional forest land.[8] According to SECL's 2019-20 Annual Report, phase I is already operating, and the mine's production capacity has increased from 40 MTPA to 62.5 MTPA.[14] However, phase II isn't yet fully operational due to a pending forest clearance for approximately 44 more hectares of the requested forest land.[12]

In January 2020, the environment ministry approved the above proposal of mine expansion for another 30 years.[12]

Expansion Details

  • Status: Phase I, Operating; Phase II, Proposed
  • Capacity: 22.5 MTPA
  • Mineable Reserves:
  • Start Year:
  • Source of Financing:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://scclmines.com/TestFold/EnvDocs/2023002.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://d3u7ubx0okog7j.cloudfront.net/documents/SECL_Annual_Report_2022-23.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 (PDF) https://www.secl-cil.in/writereaddata/EAS_2019-20SECLKusmundaArea.pdf. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://coal.nic.in/sites/default/files/2022-05/srn-march-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://coal.nic.in/sites/default/files/2023-05/srn-march-2023_0.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20240613224926/https://coal.nic.in/sites/default/files/2024-05/srn-march-2024.pdf. Archived from the original (PDF) on 13 June 2024. {{cite web}}: Missing or empty |title= (help)
  7. India clears ten coal projects and introduces new coal mining law, Mining Technology, January 9, 2020.
  8. 8.0 8.1 8.2 South Eastern Coalfields Limited, Executive Summary for Environmental Impact Assessment of Proposed Kusmunda Open Cast Expansion Project, accessed February 28, 2020
  9. 35th Annual Report 2020-21, South Eastern Coalfields Limited, accessed August 2022.
  10. Environmental Audit Statement for 2019-20 for Kusmunda OC Project, South Eastern Coal Limited, accessed August 2022.
  11. 11.0 11.1 Environment Clearance for expansion of the Kusmunda Coal Mine, MoEF&CC India, 3 February 2016
  12. 12.0 12.1 12.2 "MoEFCC Grants Multiple Extensions to Kusmunda Mine in Chhattisgarh despite Public Opposition", Land Conflict Watch, Sept. 26, 2016.
  13. Half-Yearly Compliance of Environmental Clearance Kusmunda OCP, South Eastern Coalfields Limited, accessed August 2022.
  14. 34th Annual Report 2019-20, South Eastern Coalfields Limited, accessed August 2022.