Legrad Hybrid Power Project solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: SE Kutnjak, Faza 2, SE Selnica Podravska, Faza 1
Legrad Hybrid Power Project solar farm is a shelved solar photovoltaic (PV) farm in Koprivnica-Križevci County, Croatia.
Project Details
Table 1: Phase-level project details for Legrad Hybrid Power Project solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Kutnjak | Shelved (inferred April 2023) | 44 MWac[1] | PV[1] | EEG Energy Gas DOO[1] |
Selnica Podravska | Shelved (inferred April 2023) | 42 MWac[1] | PV[1] | EEG Energy Gas DOO[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Legrad Hybrid Power Project solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Kutnjak | Koprivnica-Križevci County, Croatia[1] | 46.2825, 16.7823 (exact)[1] |
Selnica Podravska | Koprivnica-Križevci County, Croatia[1] | 46.2876, 16.7825 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References