Kutnjak solar farm
From Global Energy Monitor
(Redirected from Legrad Hybrid Power Project solar farm)
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Legrad Hybrid Power Project solar farm, SE Kutnjak
Kutnjak solar farm is a solar photovoltaic (PV) farm in pre-construction in Koprivnica-Križevci County, Croatia.
Project Details
Table 1: Phase-level project details for Kutnjak solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2026 (planned)[1] | 99 MWac[1] | PV[1] | EEG Energy Group doo[1] |
2 | Pre-construction[1] | 2026 (planned)[1] | 99 MWac[1] | PV[1] | EEG Energy Group doo[1] |
3 | Pre-construction[1] | 2026 (planned)[1] | 99 MWac[1] | PV[1] | EEG Energy Group doo[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Kutnjak solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Koprivnica-Križevci County, Croatia[1][2] | 46.2825, 16.7823 (exact)[1][2] |
2 | Koprivnica-Križevci County, Croatia[1][2] | 46.2825, 16.7823 (exact)[1][2] |
3 | Koprivnica-Križevci County, Croatia[1][2] | 46.2825, 16.7823 (exact)[1][2] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 (PDF) https://web.archive.org/web/20240219005052/https://eeg-group.eu/wp-content/uploads/2023/06/SE-Kutnjak-Feasibility-study_v1.5.pdf. Archived from the original (PDF) on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 (PDF) https://web.archive.org/web/20220724102907/https://mingor.gov.hr/UserDocsImages/UPRAVA-ZA-PROCJENU-UTJECAJA-NA-OKOLIS-ODRZIVO-GOSPODARENJE-OTPADOM/Opuo/OPUO_2021/19_11_2021_Elaborat_SE_Kutnjak_SE_Selnica_Podravska.pdf. Archived from the original (PDF) on 24 July 2022.
{{cite web}}
: Missing or empty|title=
(help)