Liang Bei Coal Mine

From Global Energy Monitor
(Redirected from Liang Bei coal mine)

Liang Bei coal mine the construction site is located within Yuzhou City, Henan Province, and the designed production capacity is 2.4 million tonnes per year.[1]

Location

The undated satellite photo below shows the coal mine located in Liangbei Town, Yuzhou City, Henan Province, China.

Loading map...

Coal Mine Background

On April 28, 2018, the National Energy Administration approved the Liang Bei Coal Mine Reconstruction and Expansion Project in Henan Pingdingshan Mining Area, and the mine construction scale was expanded from 900,000 tons per year to 2.4 million tons per year.[1]

The Liang Bei Coal Mine Reconstruction and Expansion Project was put into production in 2022 and is expected to reach full production in 2023.[2]


Project Details

  • Sponsor: Henan Xuchang Xinlong Mine Industry Co., Ltd.[1]
  • Parent Company: Henan Shenhuo Group Co., Ltd. (24.21%), Shangqiu Oriental Investment Co., Ltd. (13.68%), others (62.11%)[3]
  • Location: Liangbei Town, Yuzhou City, Henan Province, China[4]
  • GPS Coordinates: 34.090606,113.464711(approximate)
  • Status: Operating[2]
  • Production Capacity: 2.4Mt/year[1]
  • Workforce Size: 3000-3999[3]
  • Coal Field: Pingdingshan Coal Field[1]
  • Total Resource: 223.6163Mt[4]
  • Mineable Reserves: 131.7677Mt[4]
  • Coal Type: Bituminous coal (lean coal)[4]
  • Mine Size: 42.3276k㎡[4]
  • Mine Type: Underground[1]
  • Start Year: 2022[2]
  • Source of Financing:

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "国家能源局关于河南平顶山矿区梁北煤矿改扩建项目核准的批复",中国煤炭网, 检索日期:2020/09/07
  2. 2.0 2.1 2.2 "神火股份:梁北煤矿2022年计划产量约140万吨 已包含在660万吨之内 - 华强财经社". www.sh-hqjm.com. April 12, 2022. Retrieved 2022-05-24.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "河南省许昌新龙矿业有限责任公司",企查查,检索日期:2020/09/07
  4. 4.0 4.1 4.2 4.3 4.4 "河南省许昌新龙矿业有限责任公司梁北矿采矿权评估报告书", 搜狐网,检索日期:2020/09/07

Related GEM.wiki articles