NLC CPSU Scheme Phase-II solar plant
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Barsingar solar farm (Phase 1)
NLC CPSU Scheme Phase-II solar plant is a solar photovoltaic (PV) farm in pre-construction in Barsingar, Bikaner, Rajasthan, India.
Project Details
Table 1: Phase-level project details for NLC CPSU Scheme Phase-II solar plant
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1][2] | 2024 (planned)[1][2] | 300 MWac[1][3] | PV[1][2] | NLC India LTD [100%][1][2] |
2 | Pre-construction[3] | 2024 (planned)[4] | 200 MWac[3] | PV[5] | NLC India LTD [100%][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for NLC CPSU Scheme Phase-II solar plant
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Barsingar, Bikaner, Rajasthan, India[6] | 28.018, 73.3033 (approximate)[6] |
2 | Bikaner, Rajasthan, India[6] | 28.018, 73.3033 (approximate)[6] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://web.archive.org/web/20240201110308/https://www.nlcindia.in/new_website/PPT%20presented%20to%20Investors.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 (PDF) https://web.archive.org/web/20240207090103/https://www.ireda.in/images/HTMLfiles/RfS5000MW.pdf. Archived from the original (PDF) on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 (PDF) https://web.archive.org/web/20240201102523/https://www.ireda.in/images/HTMLfiles/RESULTS%20OF%20VGF%20BASED%20BIDDING%20%28TRANCHE-III%29%20FOR%205%2C000%20MW%20GRID%20CONNECTED%20SOLAR%20POWER%20PROJECTS%20IN%20INDIA%20UNDER%20CPSU%20SCHEME%20PHASE-II.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://web.archive.org/web/20240206155428/https://www.nlcindia.in/new_website/Investor%20Presentation%20dt%2005.07.2022.pdf. Archived from the original (PDF) on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240201102525/https://economictimes.indiatimes.com/industry/renewables/nhpc-awards-contracts-for-1000-mw-solar-project/articleshow/91524411.cms. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240206221007/https://www.pv-magazine-india.com/2022/05/05/sjvn-awards-1-gw-solar-epc-project-to-tata-power/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)