Ramagundam III Coal Mine is an operating coal mine in Telangana, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Ramagundam III Coal Mine | Telangana, India | 18.6976, 79.5352 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
9.52[1] | 8.159[1] | 2022[1] | Surface | Open Pit | 14[1] | 170[1] | 2228[1] |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
66.12[2] | 2023[2] | 224[1] | Peddapalli | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
The Singareni Collieries Co Ltd[3] | Government of Telengana [51%]; Government of India [49%] | India |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | 6.8[4] | 6.35[4] | 6.79[4] | 7.44[4] | 8.156[1] | 8.159[1] | – |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.
Background on Mine
The Ramagundam Opencast -III Coal Mine Project is operated by Singareni Collieries Company Limited, a subsidiary of Coal India, on an area of 1393.81 Ha in village Venkatrao pally Jallaram, Mandal Ramagiri, District Peddapalli, State Telangana, India.[5]
According to its latest environmental statement, the project was accorded with environmental clearance by MoEF, Vide letter No. J11015/23/86-IA dated 17.02.1988 for a rated capacity of 2.75 MTPA, subsequently production was raised from 2.75MTPA to 4.30 MTPA with peak production of 5.0MTPA and mine block area from 442.0 Ha to 756.71 Ha(surface) with total land requirement up to 1393.81 Ha. Environmental Clearance is accorded by Ministry Of Environment and Forests in July 2008 for this extension project. Later again it has been proposed to extend the mine boundary towards south side annexing the property of underground mines i.e. GDK 8 and 8A inclines named as RG OC-III Extension Phase –II Project. It is proposed now to increase the production capacity of the project from 5.0 MTPA to 6.8 MTPA with peak production and mine block area from 756.71 Ha to 1113.30 Ha(surface) with total land requirement up to 2070.10 Ha. Public hearing was conducted on 06th August 2014. Environmental Clearance is accorded by Ministry Of Environment and Forests for this extension project dated 02 March 2021 for a peak production capacity of 8.16 MTPA, again Environmental Clearance is accorded by Ministry Of Environment and Forests for this extension project vide letter .No J11015/43/2013-IA.II (M) dated 16 December 2022 for a peak production capacity of 9.52 MTPA. [6]
Expansion Details
- Status: Construction
- Size of Expansion: 6.80 MTPA on an ML of 2070.10 Ha
- Permits and Applications:Environment Clearance for Expansion of Ramagundam Opencast -III Coal Mine Project Phase-II to 6.80 MTPA, MoEF&CC India, 11 May 2015
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 (PDF) https://web.archive.org/web/20240109190229/https://scclmines.com/env/docs/ECS/200175.pdf. Archived from the original (PDF) on 09 January 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20240123175302/https://scclmines.com/env/docs/ECS/200171.pdf. Archived from the original (PDF) on 23 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240723000818/https://scclmines.com/scclnew/our-business_products-and-services_coal-grades.asp. Archived from the original on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 (PDF) https://scclmines.com/env/docs/ECS/200172.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs namedECC
- ↑ Environmental Statement of Ramagundam Opencast-III Expansion Phase-II Coal Mine Project for the year 2022-2023, SCCL, Sept 2023