Ramagundam I Coal Mine

From Global Energy Monitor
(Redirected from Ramagundam OC-I coal mine)
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Ramagundam I Coal Mine is an operating coal mine in Telangana, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Ramagundam I Coal Mine Telangana, India 18.666357, 79.539274 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating 1974

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
5.3[1] 3.3[2] 2022[2] Surface Open Pit 9.23 50* #REF!*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
0.521[3] 2022[3] 68.22 Peddapalli Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
The Singareni Collieries Co Ltd[4] Government of Telengana [51%]; Government of India [49%] India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 3.3[5] 3.69[5]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.

Background on Mine

The Ramagundam Opencast -I Coal Mine Project is operated by Singareni Collieries Company Limited, a subsidiary of Coal India, on an area of 923.88 Ha in Julapalli, Mandal Ramagiri, District Peddapally, State Telangana, India.[6]

The OCP-1 has been operational since 1974 when it was launched by the then Chief Minister Jalagam Vengal Rao.[7] The project started operating at a capacity of 1.5 MTPA and then received permission for expansion in lease area from 503.0 ha to 710.13 ha. with the same capacity and granted Environment Clearance 11 September 2006.[8]

The project further received environment clearance for phase 2 expansion for a peak capacity of 3.3 MTPA on a 923.88 Ha on 31 July 2008. This expansion was achieved by merger of two mines, GDK 10 UG mine of 1.5 MTPA and Ramagundam Opencast -I Expansion Coal Mine Project of 1.5 MTPA on an area of 923.88 Ha.[9]

Expansion Details

  • Status: Operating
  • Size of Expansion:
  • Permits and Applications:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://web.archive.org/web/20240122235348/https://scclmines.com/env/docs/ECS/200151.pdf. Archived from the original (PDF) on 22 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://coal.nic.in/sites/default/files/2023-05/srn-march-2023_0.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://scclmines.com/TestFold/EnvDocs/2023002.pdf. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240723000818/https://scclmines.com/scclnew/our-business_products-and-services_coal-grades.asp. Archived from the original on 23 July 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20240613224926/https://coal.nic.in/sites/default/files/2024-05/srn-march-2024.pdf. Archived from the original (PDF) on 13 June 2024. {{cite web}}: Missing or empty |title= (help)
  6. EC compliance report, April - September 2019, SCCL
  7. OCP-1 leads in SCCL coal production, K M Dayashankar, The Hindu, 14 April 2018
  8. Environment Clearance for Expansion of Ramagundam Opencast -I Coal Mine Project, MoEF&CC India, 11 July 2006
  9. Environment Clearance for Phase 2 Expansion of Ramagundam Opencast -I Expansion Coal Mine Project to 3.3 MTPA, MoEF&CC India, 31 July 2008