Redstone Concentrated Solar Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Redstone Concentrated Solar Project is a solar thermal farm under construction in Tsantsabane Local Municipality, ZF Mgcawu District Municipality, Northern Cape, South Africa.
Project Details
Table 1: Phase-level project details for Redstone Concentrated Solar Project
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2024 (planned)[2] | 100 MWac[1] | Solar Thermal[1] | ACWA Power Co [45%]; SolarReserve; other [55%] (other)[3][3] | NOMAC[4] |
Location
Table 2: Phase-level location details for Redstone Concentrated Solar Project
Location | Coordinates (WGS 84) |
---|---|
Tsantsabane Local Municipality, ZF Mgcawu District Municipality, Northern Cape, South Africa[4] | -28.2919, 23.3407 (exact)[4] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240125152945/https://www.ipp-projects.co.za/ProjectDatabase. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206155344/https://helioscsp.com/redstone-concentrated-solar-power-project-on-track-in-south-africa/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240206185227/https://www.nsenergybusiness.com/projects/redstone-concentrated-solar-project/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240206171433/https://acwapower.com/en/projects/redstone-csp-ipp/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)