Nanyang Neixiang power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Nanyang Neixiang power station (中誉国信南阳发电厂) is an operating power station of at least 2000-megawatts (MW) in Tuandong Town, Neixiang, Nanyang, Henan, China with multiple units, some of which are not currently operating. It is also known as 国投南阳发电公司内乡煤电一体化电厂 (Unit 1 & 2).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Nanyang Neixiang power station | Tuandong Town, Neixiang, Nanyang, Henan, China | 33.086416, 111.90004 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 33.086416, 111.90004
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase II Unit 3 | construction[1][2] | coal: unknown | 1000 | ultra-supercritical | – |
Phase II Unit 4 | construction[1] | coal: unknown | 1000 | ultra-supercritical | – |
Unit 1 | operating | coal: unknown | 1000 | ultra-supercritical | 2020 |
Unit 2 | operating | coal: unknown | 1000 | ultra-supercritical | 2021 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase II Unit 3 | Investment In Nanyang Power Generation Co Ltd [100%] | Zhongyu Guosen Investment Co Ltd [53.5%]; Wintime ENERGY Group Co Ltd [28.0%]; Shenzhen Zhongtai Guoxing Investment Co Ltd [13.7%]; other [4.9%] |
Phase II Unit 4 | Investment In Nanyang Power Generation Co Ltd [100%] | Zhongyu Guosen Investment Co Ltd [53.5%]; Wintime ENERGY Group Co Ltd [28.0%]; Shenzhen Zhongtai Guoxing Investment Co Ltd [13.7%]; other [4.9%] |
Unit 1 | Investment In Nanyang Power Generation Co Ltd [100%] | Zhongyu Guosen Investment Co Ltd [53.5%]; Wintime ENERGY Group Co Ltd [28.0%]; Shenzhen Zhongtai Guoxing Investment Co Ltd [13.7%]; other [4.9%] |
Unit 2 | Investment In Nanyang Power Generation Co Ltd [100%] | Zhongyu Guosen Investment Co Ltd [53.5%]; Wintime ENERGY Group Co Ltd [28.0%]; Shenzhen Zhongtai Guoxing Investment Co Ltd [13.7%]; other [4.9%] |
Project-level coal details
- Permit(s): [3]
Background on Project
SDIC & Zhongyu Guoxin Energy proposed a 2,000 MW power station in Neixiang County around 2014.[4][5] The power station was permitted in July 2015,[6] and the power station was under construction that year.[7]
2017: Plant postponed by government
In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[8]
Nanyang Neixiang power station Units 1-2 were among the postponed coal-burning units,[8] and also appeared on an updated list of postponements released in September 2017.[9]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
2018: Construction ongoing
Satellite photos from July 2017 to April 2018 showed construction was ongoing at the plant.
2020: Plant commissioned
Unit 1 was commissioned in January 2020.[10][11]
Unit 2 was commissioned in June 2021.[12]
Expansion
In September, public review for a 2 x 1,000 MW expansion was underway.[13] The project also appeared featured in a related list.[14]
In November 2022, a ceremony was reportedly held to mark the beginning of construction.[15] It was unclear if the power station had received a permit, and presumed that any work was only preliminary.
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240125083434/https://mp.weixin.qq.com/s/g8qRn1-BDg4GisbXxWPYRA. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125083541/https://mp.weixin.qq.com/s/_3uuxCYNE807sOOLFtR6Tg. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125083536/http://lkfdj.com/index.php?c=content&a=show&id=31. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "内乡县煤电运一体化电厂工程环评报告第一次公示," www.neixiangxian.gov.cn, 2014-09-10
- ↑ "国投华中内乡煤电运一体化电厂工程社会稳定风险评估公示," 河南经济报南阳新闻, 2015-03-01
- ↑ "关于国投南阳发电有限公司内乡煤电运一体化电厂新建工程项目核准的批复," 豫发改能源, 2015-7-31
- ↑ "国投内乡煤电运一体化电厂新建项目获核准," SDIC, 2015年7月31日
- ↑ 8.0 8.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "南阳电厂百万发电机组投产 永泰能源再增新动能," 中国财富网, 2020年01月14日
- ↑ "内乡:百亿大项目挺起工业脊梁 高质量发展再添澎湃动能--县区----龙腾南阳". www.longtengnanyang.com. 2020-01-16. Retrieved 2021-01-05.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "国投南阳电厂一期(2×1000MW)工程2号机组168小时满负荷试运行成功," 内乡县政府, 2021-06-12
- ↑ "南阳电厂二期(煤电运一体化)工程南阳电厂二期(煤电运一体化)工程 环境影响评价公众参与第一次信息公示," yanshougs, 2022-09-30
- ↑ "83个电力能源项目!河南省全面加快基础设施建设稳住经济大盘重点项目清单发布【附名单】," BJX, 2022-08-10
- ↑ "南阳电厂二期(2×1000MW)工程开工," BJX, 2022-11-17
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.