Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Siping power station (吉电股份-四平第一热电公司, 国家电投吉电股份四平热电厂) is an operating power station of at least 550-megawatts (MW) in 239 Zhongyang E Road, Tiedong, Siping, Jilin, China with multiple units, some of which are not currently operating. It is also known as 吉长电力 (Phase II Unit 4, Phase II Unit 5 (Replacement)).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Siping power station | 239 Zhongyang E Road, Tiedong, Siping, Jilin, China | 43.15384, 124.40294 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase II Unit 4, Phase II Unit 5 (Replacement): 43.15384, 124.40294
- Phase I Unit 1, Phase I Unit 2, Phase I Unit 3: 43.1544762, 124.4009424
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: lignite | 50 | subcritical | 1996 | 2023 (planned) |
Phase I Unit 2 | operating | coal: lignite | 50 | subcritical | 1996 | 2023 (planned) |
Phase I Unit 3 | operating | coal: lignite | 100 | subcritical | 1999 | 2023 (planned) |
Phase II Unit 4 | operating | coal: lignite | 350 | subcritical | 2013 | – |
Phase II Unit 5 (Replacement) | announced | coal: lignite | 350 | subcritical | – | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Jilin Electric Power Co Ltd Siping No. 1 Thermal Power Co [100%] | Jilin Electric POWER Co Ltd [100.0%] |
Phase I Unit 2 | Jilin Electric Power Co Ltd Siping No. 1 Thermal Power Co [100%] | Jilin Electric POWER Co Ltd [100.0%] |
Phase I Unit 3 | Jilin Electric Power Co Ltd Siping No. 1 Thermal Power Co [100%] | Jilin Electric POWER Co Ltd [100.0%] |
Phase II Unit 4 | Jilin Electric Power Co Ltd Siping No. 1 Thermal Power Co [100%] | Jilin Electric POWER Co Ltd [100.0%] |
Phase II Unit 5 (Replacement) | Jilin Electric Power Co Ltd Siping No. 1 Thermal Power Co [100%] | Jilin Electric POWER Co Ltd [100.0%] |
Background
Siping-1
Siping-1 power station, originally a joint venture between Chueng Kong Infrastructure and CPI, is a three-unit 200 MW power station that went into operation in 1996 to 1999.[1]
Siping-2
Siping-2 power station is a 2 x 350 MW coal plant under development near Siping-1. Unit 1 began construction in 2008, was permitted in 2009, completed the trial operation in 2010, but was not put into commercial operation until 2013.[2]
As of 2015 Unit 2 is still seeking environmental clearance.[3] In 2021, the proposed unit was listed in Jilin Province's 14th Five Year Plan (2021-2025).
As of June 2022, the new 350 MW same-capacity replacement unit was planned to begin construction by May 2023, and the three oldest units were expected to retire before then.[4]
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[5]
Articles and Resources
References
- ↑ "中电投四平热电公司," 东北亚煤炭交易中心, 2008-10-7
- ↑ "中电投四平热电“上大压小”安全设施通过验收," 北极星电力网新闻中心, 2013-7-22
- ↑ "吉林电力股份有限公司四平热电公司," State Power Investment Corp, accessed Sep 2015
- ↑ "市发改委助力稳定全市经济基本盘加快能源领域项目建设," Siping, 2022-06-17
- ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.