Search results

From Global Energy Monitor
Results 1 – 11 of 11
Advanced search

Search in namespaces:

  • LNG Canada Terminal (category Global Gas Infrastructure Tracker)
    companies announced in July 2016 that they would indefinitely delay a final investment decision, and in mid-2017, announced that a final investment decision would
    14 KB (1,640 words) - 19:59, 4 December 2024
  • Krk FSRU (category Global Gas Infrastructure Tracker)
    was switched to a FLNG proposal in 2015, being declared by the Croatian government as a Strategic Investment Project. The project is a part of the European
    25 KB (2,872 words) - 19:34, 4 December 2024
  • (DRI) modules with a combined capacity of 840 ttpa (thousand tonnes per annum) and a melt shop with two 90-tonne Demag electric arc furnaces (EAF). A third
    15 KB (1,119 words) - 18:12, 11 April 2024
  • Néstor Kirchner Gas Pipeline (category Global Gas Infrastructure Tracker)
    from the Vaca Muerta shale fields, most notably reviving a proposal for a longer pipeline that would transport Vaca Muerta gas to Brazil (see below). In
    40 KB (4,323 words) - 19:59, 4 December 2024
  • Cyprus LNG Terminal (category Global Gas Infrastructure Tracker)
    regasification unit (FSRU), a jetty intended for the unit’s mooring, a jetty borne, a natural gas pipeline and an onshore gas pipeline, a shoreside block valve
    25 KB (3,038 words) - 19:50, 4 December 2024
  • interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website
    21 KB (1,527 words) - 17:40, 11 April 2024
  • Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive
    7 KB (756 words) - 23:57, 13 September 2024
  • "decision trees". A decision tree can be thought of as a flowchart to make a decision, e.g., "should I bring a rain jacket today?" In such a case, the tree
    13 KB (1,770 words) - 20:28, 9 October 2023
  • (MC943) - Shell Oil and Gas Asset\n"}]} PowerNap is a tie-back to the Shell-operated Olympus hub, at a depth of in 1,280 meters of water. In 2019, Shell
    5 KB (516 words) - 19:05, 27 August 2024
  • Power sector transition in Balochistan (category Global Energy Transition Tracker)
    up to two years, and a maximum amount for a single borrower of Rs. 6 billion. Category II: Available for projects up to 1 MW for a developer's own use or
    77 KB (8,146 words) - 17:36, 7 October 2024
  • Power Sector Transition in Albay (category Global Energy Transition Tracker)
    necessary. Projects must also complete a System Impact Study, a Facility Study, a Distribution Impact Study, and a Distribution Asset Study during this phase
    63 KB (5,743 words) - 15:18, 10 December 2024