Sukkur solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Meridian Energy (Pvt.) Ltd (Phase 1), Helios Power (Pvt.) Limited (Phase 3), HND Energy (Pvt.) Limited (Phase 2), Scatec Sukkur solar farm

Sukkur solar farm is a solar photovoltaic (PV) farm under construction in Sukkur, Sindh, Pakistan.

Project Details

Table 1: Phase-level project details for Sukkur solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Construction[1] 2023 (planned)[2][3] 50 MWp/dc[1] PV[4] Scatec ASA [51%]; H1 Holdings [49%][4][4] Scatec ASA[5]
2 Construction[1] 2023 (planned)[2][3] 50 MWp/dc[1] PV[4] Scatec ASA [51%]; H1 Holdings [49%][4][4] Scatec ASA[5]
3 Construction[1] 2023 (planned)[2][3] 50 MWp/dc[1] PV[4] Scatec ASA [51%]; H1 Holdings [49%][4][4] Scatec ASA[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Sukkur solar farm

Phase Name Location Coordinates (WGS 84)
1 Sukkur, Sindh, Pakistan[5] 24.8739, 67.0169 (approximate)[5]
2 Sukkur, Sindh, Pakistan[5] 24.8739, 67.0169 (approximate)[5]
3 Sukkur, Sindh, Pakistan[5] 24.8739, 67.0169 (approximate)[5]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240201133326/https://www.brecorder.com/news/40286875/ajax-request. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240206161328/https://scatec.com/wp-content/uploads/sites/7/2023/08/Scatec-second-quarter-and-first-half-report-2023.pdf. Archived from the original (PDF) on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240126125836/https://www.ppib.gov.pk/alternative-upcoming-ipps/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 https://web.archive.org/web/20240207111811/https://scatec.com/locations/pakistan/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 https://web.archive.org/web/20240206172642/https://renewablesnow.com/news/scatec-achieves-fin-close-for-150-mw-solar-project-in-pakistan-731872/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)