Tepor Macaé FSRU

From Global Energy Monitor
(Redirected from Tepor Macaé LNG Terminal)
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Tepor Macaé FSRU is a proposed LNG terminal in the state of Rio de Janeiro, Brazil.

Location

The proposed terminal will be located within the Tepor Macaé port complex, northeast of the city of Macaé, Rio de Janeiro state, Brazil.[1]

Loading map...

Project Details

  • Sponsor: Eneva, EBTE Engenharia[2][3]
  • Owner: Eneva [65%]; Grupo Vale Azul Participações [35%][4][5]
  • Parent comapny: Eneva [65%]; Grupo Vale Azul Participações [35%]
  • Location: Macaé, Rio de Janeiro state, Brazil
  • Coordinates: -22.323277, -41.723130 (approximate)
  • Capacity: 21 MMcm/d[1][5]
  • Status: Proposed
  • Type: Import
  • Start Year: 2028[6]
  • Cost: 5 billion BRL (cost estimate for first phase of port project; unclear how much of this is specifically related to the LNG terminal)[7]
  • Financing:

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

The proposed Tepor Macaé terminal is part of the massive new Terminal Portuário de Macaé port complex. The port and terminal project was originally to be developed by EBTE Engenharia[3], a subsidiary of Grupo Vale Azul Participações.[2]

The Tepor port project obtained its preliminary license from Rio de Janeiro's state environmental agency INEA (Instituto Estadual do Ambiente) in November 2019.[1] Plans call for a multi-use port that will provide a variety of oil and gas processing, storage and transport services, including an LNG terminal comprising an FSRU (floating supply and regasification unit) with a capacity of 21 MMcm per day and an area reserved for LNG storage tanks.[1][5][8] Construction of the new port complex was originally expected to begin in 2021.[9]

Potential customers for the LNG terminal include eight gas-fired power plants in the Macaé area: EDF's existing 827 MW Norte Fluminense power station, the 565 MW Marlim Azul power station currently under development by Pátria Investments, Shell and Mitsubishi Hitachi Power Systems[3][10], the Vale Azul II and III power stations, both already licensed with a total capacity of 1240 MW, and the proposed 5275 MW Litos power station.[1]

As of July 2021, the Tepor Macaé Terminal continued to be listed by the Brazilian government as an active project in the licensing phase, still awaiting a final investment decision.[11][12]

In September 2021, Brazilian energy giant Eneva announced that it had signed a deal with Grupo Vale Azul giving Eneva exclusive negotiating rights to the project through 2022 and preferential rights through 2024.[4][13] The deal, which remained subject to technical and financial viability studies, would initially grant Eneva a 65% ownership stake in the joint venture, with Vale Azul Participações holding the remaining 35%.[4] Under the agreement, Eneva retained the right to assume 100% ownership of the project at its discretion anytime between January 2023 and December 2024.[4][14]

As of July 2023, construction of the new port complex was expected to begin in the first half of 2024, with commercial operations getting underway by the end of 2026; however, the precise timeline for developing the associated LNG terminal remained unclear.[7]

As of August 2024, all licenses and authorizations were in place, but further development of the port complex appeared to be on hold. The timeline for its completion had reportedly slipped to 2027 or 2028, with construction now scheduled to start no earlier than 2025.[6]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "Terminais de GNL no Brasil (pp 24-25)" (PDF). EPE (Empresa de Pesquisa Energética). October 2020.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 "Eneva anuncia compra do Tepor". O Debate, Diário de Macaé. September 23, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 "Terminais de Regaseificação de GNL no Brasil: Panorama dos Principais Projetos (pp 23-24)" (PDF). EPE (Empresa de Pesquisa Energética). August 30, 2019.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 "Eneva assume controle do novo porto de Macaé | Diário do Porto". Diário do Porto. September 28, 2021.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 5.2 "Informações do Licenciamento: TEPOR Terminal Portuário de Macaé Ltda". INEA (Instituto Estadual do Ambiente). November 5, 2019.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 Passeado, Fernando (2024-08-13). "EXCLUSIVO! Quando começa a obra do Porto de Macaé?". Economia & Negócios.{{cite web}}: CS1 maint: url-status (link)
  7. 7.0 7.1 "Terminal Portuário de Macaé prevê investimentos de R$ 5 bilhões e criação de 14 mil empregos". O Dia. July 5, 2023.
  8. "Tepor Macaé requer licença ambiental ao INEA". O Debate - Diário de Macaé. October 14, 2020.
  9. "Tepor Macaé: Adiado o início das obras para início de 2021". O Debate - Diário de Macaé. May 16, 2020.
  10. "Brazil prepares for a new phase of investments in LNG terminals". LNG Latin America and the Caribbean. Retrieved 2021-04-24.
  11. "PITER (Plano Indicativo de Terminais de GNL)" (PDF). EPE (Empresa de Pesquisa Energética). July 2021.{{cite web}}: CS1 maint: url-status (link)
  12. "PITER 2021: Indicative LNG Terminals Plan" (PDF). EPE (Empresa de Pesquisa Energética). October 2021.{{cite web}}: CS1 maint: url-status (link)
  13. "Brazil's Eneva, Servtec to partner on proposed Maranhao LNG terminal". S&P Global. November 22, 2021.{{cite web}}: CS1 maint: url-status (link)
  14. "Eneva vai administrar novo terminal portuário de Macaé". Jornal Terceira Via. April 8, 2022.{{cite web}}: CS1 maint: url-status (link)