Toek Phos solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Schneitec Tek Phos solar farm, Schneitec Tek Phos Pv, Kampong Chhnang I

Toek Phos solar farm is an operating solar photovoltaic (PV) farm in Taing Krasaing, Toek Phos, Kampong Chhang, Cambodia.

Project Details

Table 1: Phase-level project details for Toek Phos solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2020[2] 60 MWac[3] PV[3] SchneiTec Renewable Company LTD[3] SchneiTec Renewable Company LTD[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Toek Phos solar farm

Location Coordinates (WGS 84)
Taing Krasaing, Toek Phos, Kampong Chhang, Cambodia[1][3] 12.0860, 104.5170 (exact)[4]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://numerical.co.in/numerons/collection/603f0911cca6110490295103. {{cite web}}: Missing or empty |title= (help)
  2. https://www.phnompenhpost.com/business/new-solar-farm-hooks-national-grid. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 https://www.khmertimeskh.com/712430/third-solar-power-station-joins-national-grid/. {{cite web}}: Missing or empty |title= (help)
  4. "Wiki-Solar Database". https://wiki-solar.org/. April, 2023. Adapted with permission. {{cite web}}: Check date values in: |date= (help); External link in |website= (help)CS1 maint: url-status (link)