Wilhelmshaven NWO FSRU
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Wilhelmshaven NWO FSRU Terminal is a proposed floating storage regasification unit (FSRU) terminal for LNG import in Germany.[1] As of September 2024, there have been no updates in over two years, and the project is presumed to be shelved.
Location
The terminal is proposed to be located in Wilhelmshaven port, Lower Saxony, Germany.[1]
Project details
- Operator: Nord West Ölleitung[1]
- Owner: Nord West Ölleitung[1]
- Parent company: Ruhr Oel GmbH [33.69%]; BP plc [25.64%]; Shell plc [20.4%]; Holborn Europa Raffinerie [20.27%][2]*
- Location: Wilhelmshaven port, Lower Saxony, Germany[1]
- Coordinates: 53.516667, 8.133333 (approximate)
- Capacity: 9 bcm/y[1]
- Status: Shelved
- Type: Import
- Start year: 2023[1]
- Cost:
- Financing:
- Associated infrastructure:
Note: mtpa = million tonnes per year; bcm/y = billion cubic meters per day
*Nord West Ölleitung is owned by BP Europa SE [25.64%], Holborn Europa Raffinerie GmbH [20.27%], Ruhr Oel GmbH [33.69%], and Shell Deutschland GmbH [20.4%].[2] Highest-level parent companies are inferred from these.
Background
Following Russia's invasion of Ukraine in February 2022, and Germany's desire to wean itself off of Russian gas imports, a proposal from Nord West Ölleitung (NWO) to install an FSRU unit with 9 bcm/y capacity at Wilhelmshaven in Lower Saxony emerged as one of three possible LNG import projects at the port complex, along with the Wilhelmshaven FSRU Terminal and the TES Wilhelmshaven LNG Terminal. In March 2022, Lower Saxony's energy minister Olaf Lies referred in speeches and a letter to the federal government to the potential for the Wilhelmshaven NWO FSRU Terminal to be commissioned by autumn 2023. An "LNG Wilhelmshaven" task force, consisting of 30 representatives from local authorities and the port industry, was established by the Lower Saxony state government.[1][3]
As of September 2024, there have been no updates in over two years, and the project is presumed to be shelved.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Heiko Lohmann, Pipelines for LNG terminals in Wilhelmshaven become more concrete, energate messenger, Mar. 25, 2022
- ↑ 2.0 2.1 Nord West Ölleitung shareholder, Nord West Ölleitung website, accessed Apr. 28, 2022
- ↑ Minister: LNG-Import noch vor Winter 2023 möglich, Süddeutsche Zeitung, Mar. 14, 2021