This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Ada wind farm
Windstar (Ghana) wind farm is a shelved wind farm in Ada Foah, Ada East District, Ghana.
Project Details
Table 1: Phase-level project details for Windstar (Ghana) wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Shelved (inferred June 2024) | 50 MW[1] | Onshore[2] | ENGIE SA; EleQtra[3] | ENGIE; EleQtra[3] |
Location
Table 2: Phase-level location details for Windstar (Ghana) wind farm
Location | Coordinates (WGS 84) |
---|---|
Ada Foah, Ada East District, Ghana[4] | 5.8085, 0.6001 (approximate)[4] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240125154830/https://www.africa-energy.com/news-centre/article/ghana-windstar-hit-financial-close-q2-2022. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126074329/https://eleqtra.com/projects/windstar/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://theelectricityhub.com/windstar-wind-farm-to-reach-financial-close-in-next-year/ https://theelectricityhub.com/windstar-wind-farm-to-reach-financial-close-in-next-year/, https://theelectricityhub.com/windstar-wind-farm-to-reach-financial-close-in-next-year/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240131172427/https://www.africa-energy.com/database/windstar-ada-wind. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)