Xinjiang Jimsar Photovoltaic and Energy Storage solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Xinjiang Jimsar Photovoltaic and Energy Storage solar farm (中节能太阳能、新疆立新能源吉木萨尔县30万千瓦 “光伏+储能” 一体化清洁能源示范项目) is a solar farm under construction in Jimsar County, Changji, Xinjiang, China.


Project Details

Table 1: Phase-level project details for Xinjiang Jimsar Photovoltaic and Energy Storage solar farm

Status Nameplate capacity Technology Owner Operator
Construction[1] 300 MW[2] PV[2] CECEP Solar Energy Technology CO LTD; Xinjiang New Energy (Group) CO LTD[47.38%]; SEPCOIII Electric POWER Construction CO LTD[8.77%]; Xinjiang State-owned Capital Industrial Investment Fund Limited Partnership Enterprise[7.64%]; Xinjiang State-owned Capital Industrial Investment Fund Limited Partnership Enterprise[6.01%]; Others[5.26%] (中节能太阳能科技有限公司; 新疆新能源(集团)有限责任公司[47.38%]; 山东电力建设第三工程有限公司[8.77%]; 新疆维吾尔自治区哈密市国有资产投资经营有限公司[7.64%]; 新疆国有资本产业投资基金有限合伙企业[6.01%]; 其他[5.26%])[3] CECEP Solar Energy Technology Jimsar CO LTD; Xinjiang Lixin Energy CO LTD (中节能太阳能科技吉木萨尔有限公司; 新疆立新能源股份有限公司)[2]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for Xinjiang Jimsar Photovoltaic and Energy Storage solar farm

Location Coordinates (WGS 84)
Jimsar County, Changji, Xinjiang, China[2] 44.7761, 89.1020 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. http://www.xj.xinhuanet.com/zt/2022-10/03/c_1129049049.htm. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20220813212915/https://guangfu.bjx.com.cn/news/20220801/1245165.shtml. {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)CS1 maint: url-status (link)
  3. https://www.qcc.com/firm/cc50639269c69071eb5b9f58be764bf2.html. Archived from the original on September 07, 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)