Xinjiang Zhongtai Fukang power station (新疆中泰阜康热电厂) is an operating power station of at least 900-megawatts (MW) in Fukang City - Changji Hui AP, Fukang, Changji, Xinjiang, China. It is also known as 新疆中泰化学阜康能源动力站 (Phase I Unit 2, Phase I Unit 1), 新疆中泰化学中泰矿冶热电厂 (Unit 3, Unit 4, Unit 5, Unit 6).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xinjiang Zhongtai Fukang power station Fukang City - Changji Hui AP, Fukang, Changji, Xinjiang, China 44.133889, 87.784333 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2: 44.133889, 87.784333
  • Unit 3, Unit 4, Unit 5, Unit 6: 44.08098, 88.588901

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: unknown 150 subcritical 2012
Phase I Unit 2 operating coal: unknown 150 subcritical 2012
Unit 3 operating coal: unknown 150 unknown 2013
Unit 4 operating coal: unknown 150 unknown 2012
Unit 5 operating coal: unknown 150 unknown 2012
Unit 6 operating coal: unknown 150 subcritical 2012

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Xinjiang Zhongtai Chemical Fukang Energy Co Ltd [100%] Xinjiang Zhongtai Chenical Co Ltd [70.3%]; Agricultural Bank of China Ltd [26.1%]; other [1.4%]; Xi'an Jingfa Holding (Group) Co Ltd [0.4%]; Shaanxi Finance Investment Management Co Ltd [0.4%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.3%]; Far East Horizon [0.3%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.3%]; Yulin Investment Operation Group Co Ltd [0.3%]; Shaanxi Coal and Chemical Industry Co Ltd [0.2%]; Shaanxi International Trust Co Ltd [0.1%]; Chang'an Huitong Co Ltd [0.0%]
Phase I Unit 2 Xinjiang Zhongtai Chemical Fukang Energy Co Ltd [100%] Xinjiang Zhongtai Chenical Co Ltd [70.3%]; Agricultural Bank of China Ltd [26.1%]; other [1.4%]; Xi'an Jingfa Holding (Group) Co Ltd [0.4%]; Shaanxi Finance Investment Management Co Ltd [0.4%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.3%]; Far East Horizon [0.3%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.3%]; Yulin Investment Operation Group Co Ltd [0.3%]; Shaanxi Coal and Chemical Industry Co Ltd [0.2%]; Shaanxi International Trust Co Ltd [0.1%]; Chang'an Huitong Co Ltd [0.0%]
Unit 3 Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] Xinjiang Zhongtai Chenical Co Ltd [100.0%]
Unit 4 Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] Xinjiang Zhongtai Chenical Co Ltd [100.0%]
Unit 5 Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] Xinjiang Zhongtai Chenical Co Ltd [100.0%]
Unit 6 Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] Xinjiang Zhongtai Chenical Co Ltd [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): both
  • Captive industry: Chemicals


Background

The two plants are owned by Xinjiang Zhongtai Chemical Company. Xinjiang Zhongtai Fukang Energy power station is a 2 x 150 MW power station that began operating in 2012. Xinjiang Zhongtai Fukang Metallurgy power station is a 4 x 150 MW power plant that began operating in 2012-2013.[1][2][3]