Xinjiang Zhongtai Fukang power station (新疆中泰阜康热电厂) is an operating power station of at least 900-megawatts (MW) in Fukang City - Changji Hui AP, Fukang, Changji, Xinjiang, China. It is also known as 新疆中泰化学阜康能源动力站 (Phase I Unit 2, Phase I Unit 1), 新疆中泰化学中泰矿冶热电厂 (Unit 3, Unit 4, Unit 5, Unit 6).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Xinjiang Zhongtai Fukang power station | Fukang City - Changji Hui AP, Fukang, Changji, Xinjiang, China | 44.133889, 87.784333 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2: 44.133889, 87.784333
- Unit 3, Unit 4, Unit 5, Unit 6: 44.08098, 88.588901
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: unknown | 150 | subcritical | 2012 |
Phase I Unit 2 | operating | coal: unknown | 150 | subcritical | 2012 |
Unit 3 | operating | coal: unknown | 150 | unknown | 2013 |
Unit 4 | operating | coal: unknown | 150 | unknown | 2012 |
Unit 5 | operating | coal: unknown | 150 | unknown | 2012 |
Unit 6 | operating | coal: unknown | 150 | subcritical | 2012 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Xinjiang Zhongtai Chemical Fukang Energy Co Ltd [100%] | Xinjiang Zhongtai Chenical Co Ltd [70.3%]; Agricultural Bank of China Ltd [26.1%]; other [1.4%]; Xi'an Jingfa Holding (Group) Co Ltd [0.4%]; Shaanxi Finance Investment Management Co Ltd [0.4%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.3%]; Far East Horizon [0.3%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.3%]; Yulin Investment Operation Group Co Ltd [0.3%]; Shaanxi Coal and Chemical Industry Co Ltd [0.2%]; Shaanxi International Trust Co Ltd [0.1%]; Chang'an Huitong Co Ltd [0.0%] |
Phase I Unit 2 | Xinjiang Zhongtai Chemical Fukang Energy Co Ltd [100%] | Xinjiang Zhongtai Chenical Co Ltd [70.3%]; Agricultural Bank of China Ltd [26.1%]; other [1.4%]; Xi'an Jingfa Holding (Group) Co Ltd [0.4%]; Shaanxi Finance Investment Management Co Ltd [0.4%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.3%]; Far East Horizon [0.3%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.3%]; Yulin Investment Operation Group Co Ltd [0.3%]; Shaanxi Coal and Chemical Industry Co Ltd [0.2%]; Shaanxi International Trust Co Ltd [0.1%]; Chang'an Huitong Co Ltd [0.0%] |
Unit 3 | Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] | Xinjiang Zhongtai Chenical Co Ltd [100.0%] |
Unit 4 | Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] | Xinjiang Zhongtai Chenical Co Ltd [100.0%] |
Unit 5 | Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] | Xinjiang Zhongtai Chenical Co Ltd [100.0%] |
Unit 6 | Xinjiang Zhongtai Mining and Metallurgy Co Ltd [100%] | Xinjiang Zhongtai Chenical Co Ltd [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Background
The two plants are owned by Xinjiang Zhongtai Chemical Company. Xinjiang Zhongtai Fukang Energy power station is a 2 x 150 MW power station that began operating in 2012. Xinjiang Zhongtai Fukang Metallurgy power station is a 4 x 150 MW power plant that began operating in 2012-2013.[1][2][3]
Articles and Resources
References
- ↑ "First Unit of Zhongtai Chemical's Fukang Industrial Park Power Station Begins Operations," Industrial Info Resources, December 6, 2012
- ↑ "中泰化学热电厂六台机组全部建成投产且并网发电 低成本战略落地生根," Zhongtai Chemical, 2013-01-30
- ↑ "新疆中泰化学股份有限公司关于阜康能源及中泰矿冶新建项目生产运行情况的公告", 证券时报网, 2013-01-25
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.