Yung-An LNG Terminal (永安液化天然氣接收站,第一液化天然氣接收站、永安液化天然氣接收港、永安液化天然氣廠,簡稱一接) is an LNG import terminal in Kaohsiung, Taiwan.
Location
The terminal is located at Yung-An Township, Kaohsiung
Project details
- Owner: CPC Corporation
- Parent company: CPC Corporation
- Location: Yong'an Township, Kaohsiung, Taiwan
- Coordinates: 22.80928, 120.2054 (exact)
- Capacity: 10.5 mtpa[1]
- Status: Operating[2]
- Type: Import
- Start year: 1990
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Yung-An LNG Terminal is the first LNG import terminal in Kaohsiung, Taiwan, owned by CPC Corporation.[3] It began construction in 1984 and operating in 1990 with 1.5 mtpa capacity,[4] and was expanded to 7.5 mtpa in 2002.[5][6] As of July 2018 the terminal's receiving capacity was reported to be 10 mtpa.[1]
There are 6 underground storage tanks at the terminal with three 100,000 cubic meters each, and three 130,000 cubic meters each.[2]
Expansion projects
Expansion
- Owner: CPC Corporation
- Parent company:
- Location: Yong'an Township, Kaohsiung, Taiwan
- Coordinates: 22.80928, 120.2054 (exact)
- Capacity: 1.8 mtpa[7]
- Status: Construction[7][8]
- proposed (2024)
A 1.8-mtpa expansion project, which includes three new storage tanks and related regasification facilities, was estimated to be completed by the end of 2026 and become operational by 2027.[7] Construction began February 2021 according to GIIGNL.[7] However, as of February 2024, no further news on the construction progress. It's considered still not yet entering construction.
Articles and resources
References
- ↑ 1.0 1.1 GIIGNL 2021 Annual Report, accessed May 5, 2021
- ↑ 2.0 2.1 "第21屆公共工程金質獎-公共設施維護管理獎-台灣中油公司永安液化天然氣廠" (PDF). ws.pcc.gov.tw. 2021-10-13.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Yung-An LNG Terminal, GEO, accessed April 2017
- ↑ 自由時報電子報 (2021-03-04). "中油永安廠計畫增建3座LNG儲槽 明舉辦社區環說會 - 自由財經". 自由時報電子報. Retrieved 2023-02-18.
- ↑ "Yung An Lng Terminal," A Barell Full, accessed April 2017
- ↑ "Downstream Operations," CPC Corporation website, accessed August 2017
- ↑ 7.0 7.1 7.2 7.3 7.4 7.5 "GIIGNL 2022 Annual Report". GIIGNL. Retrieved 2022-05-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "https://e-info.org.tw/node/235936". Archived from the original on 22 February 2022.
{{cite web}}
: External link in
(help)|title=