Överturingen wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Länsterhöjden (Phase 1), Storflötten (Phase 2)

Överturingen wind farm is an operating wind farm in Haverö District, Västernorrland County, Sweden.

Project Details

Table 1: Phase-level project details for Överturingen wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2020[1] 84 MW[1] Onshore[1] CapMan Infra; Red Rock Power Ltd[2] SCA Energy[1]
2 Operating[1] 2020[1] 151 MW[1] Onshore[1] CapMan Infra; Red Rock Power Ltd[2] Turinge Energi[1]

Location

Table 2: Phase-level location details for Överturingen wind farm

Phase Name Location Coordinates (WGS 84)
1 Haverö District, Västernorrland County, Sweden[1] 62.5758, 14.9225 (exact)[1]
2 Haverö District, Västernorrland County, Sweden[1] 62.5161, 15.0714 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "Vindbrukskollens Karttjänst (Vindbrukskollen's Map Service)". Energimyndigheten (The Swedish Energy Agency). 2022-02-18. Archived from the original on 2024-01-25. Retrieved 2022-02-22.
  2. 2.0 2.1 https://www.sca.com/sv/fornybar-energi/projekt-och-utveckling/projekt-vindkraft/ https://www.sca.com/sv/fornybar-energi/projekt-och-utveckling/projekt-vindkraft/, https://www.sca.com/sv/fornybar-energi/projekt-och-utveckling/projekt-vindkraft/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)