Överturingen wind farm is an operating wind farm in Haverö District, Västernorrland County, Sweden.
Project Details
Table 1: Phase-level project details for Överturingen wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2020[1] | 84 MW[1] | Onshore[1] | CapMan Infra; Red Rock Power Ltd[2] | SCA Energy[1] |
2 | Operating[1] | 2020[1] | 151 MW[1] | Onshore[1] | CapMan Infra; Red Rock Power Ltd[2] | Turinge Energi[1] |
Location
Table 2: Phase-level location details for Överturingen wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Haverö District, Västernorrland County, Sweden[1] | 62.5758, 14.9225 (exact)[1] |
2 | Haverö District, Västernorrland County, Sweden[1] | 62.5161, 15.0714 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "Vindbrukskollens Karttjänst (Vindbrukskollen's Map Service)". Energimyndigheten (The Swedish Energy Agency). 2022-02-18. Archived from the original on 2024-01-25. Retrieved 2022-02-22.
- ↑ 2.0 2.1 https://www.sca.com/sv/fornybar-energi/projekt-och-utveckling/projekt-vindkraft/ https://www.sca.com/sv/fornybar-energi/projekt-och-utveckling/projekt-vindkraft/, https://www.sca.com/sv/fornybar-energi/projekt-och-utveckling/projekt-vindkraft/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)