232 Long Branch 29 Solar

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

232 Long Branch 29 Solar is an operating solar photovoltaic (PV) farm in Shelby, Cleveland, North Carolina, United States.

Project Details

Table 1: Phase-level project details for 232 Long Branch 29 Solar

Status Commissioning year Nameplate capacity Technology Operator
Operating[1] 2018[1] 2 MWac[1] PV[1] Alchemy Renewable Energy[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for 232 Long Branch 29 Solar

Location Coordinates (WGS 84)
Shelby, Cleveland, North Carolina, United States[1] 35.2322, -81.5597 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)