2W Permian Solar Project Hybrid
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Eunice Permian solar farm
2W Permian Solar Project Hybrid is an operating solar photovoltaic (PV) farm in Andrews, Andrews County, Texas, United States.
Project Details
Table 1: Phase-level project details for 2W Permian Solar Project Hybrid
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2021[2] | 420 MWac[2] | PV[2] | Ørsted A/S [100%][1] | Ørsted[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for 2W Permian Solar Project Hybrid
Location | Coordinates (WGS 84) |
---|---|
Andrews, Andrews County, Texas, United States[2] | 32.1164, -102.5283 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240207170332/https://us.orsted.com/news-archive/2021/05/orsted-completes-permian-energy-center. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help)