71 Charlotte Furnace Rd Hybrid CSG solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

71 Charlotte Furnace Rd Hybrid CSG solar farm is an operating solar photovoltaic (PV) farm in Wareham, Plymouth, Massachusetts, United States.

Project Details

Table 1: Phase-level project details for 71 Charlotte Furnace Rd Hybrid CSG solar farm

Status Commissioning year Nameplate capacity Technology Operator
Operating[1] 2021[1] 1 MWac[1] PV[1] 71CFR WHAM8 Solar, LLC[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for 71 Charlotte Furnace Rd Hybrid CSG solar farm

Location Coordinates (WGS 84)
Wareham, Plymouth, Massachusetts, United States[1] 41.7971, -70.7416 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)