7V Solar Ranch
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
7V Solar Ranch is a solar photovoltaic (PV) farm under construction in Muldoon, Fayette County, Texas, United States.
Project Details
Table 1: Phase-level project details for 7V Solar Ranch
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2024 (planned)[1] | 240 MWac[2] | PV[2] | Candela Renewables LLC [100%][3] | Candela Renewables LLC[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for 7V Solar Ranch
Location | Coordinates (WGS 84) |
---|---|
Muldoon, Fayette County, Texas, United States[2] | 29.807, -97.0741 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240206193430/https://www.co.fayette.tx.us/upload/page/1777/docs/Candela%20Renewables%20-Fayette%20County%20Abatement%20Application%20for%207V%20Solar.pdf. Archived from the original (PDF) on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)