Açor wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Parque Eóilco Açor (Phase 1)

Açor wind farm is an operating wind farm in Coimbra, Portugal.

Project Details

Table 1: Phase-level project details for Açor wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2004[1] 20 MW[1] Onshore[2] EDP Renováveis [100%][3] EDP Renováveis Portugal[4]
2a Operating[2] 2011[2] 2 MW[2] Onshore[2] EDP Renováveis [100%][5]
2b Operating[2] 2012[2] 2 MW[2] Onshore[2] EDP Renováveis [100%][5]

Location

Table 2: Phase-level location details for Açor wind farm

Phase Name Location Coordinates (WGS 84)
1 Coimbra, Portugal[6] 40.1975, -7.8016 (exact)[6]
2a Coimbra, Portugal[6] 40.1975, -7.8016 (exact)[6]
2b Coimbra, Portugal[6] 40.1975, -7.8016 (exact)[6]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 (PDF) https://web.archive.org/web/20240126035327/https://www.apren.pt/contents/documents/portugal-parques-eolicos-2018.pdf. Archived from the original (PDF) on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 (PDF) https://web.archive.org/web/20220630075400/http://e2p.inegi.up.pt/relatorios/Portugal_parques_eolicos_2021.pdf. Archived from the original (PDF) on 30 June 2022. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20210927190903/https://web3.cmvm.pt/sdi/emitentes/docs/PC78308.pdf. Archived from the original (PDF) on 27 September 2021. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20240131072109/https://www.dgeg.gov.pt/media/fhmnya1l/i011360.pdf. Archived from the original (PDF) on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 EDPR (2023). "Annual Report 2022" (PDF). Archived from the original (PDF) on 2024-03-27.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://www.google.com/maps/place/Subesta%C3%A7%C3%A3o+Parque+E%C3%B3lico+A%C3%A7or/@40.2169675,-7.8634506,1141m/data=!3m2!1e3!4b1!4m5!3m4!1s0xd22d33995a99b33:0x3882d601d28a0a7b!8m2!3d40.2169675!4d-7.8612619. {{cite web}}: Missing or empty |title= (help)