A1 wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
A1 wind farm is a cancelled wind farm in Great Stainton, County Durham, North East, England, United Kingdom.
Project Details
Table 1: Phase-level project details for A1 wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Cancelled[1] | 20 MW[1] | Onshore[1] | E.ON UK Renewables Ltd [100%][1] | E.ON UK Renewables[2] |
Location
Table 2: Phase-level location details for A1 wind farm
Location | Coordinates (WGS 84) |
---|---|
Great Stainton, County Durham, North East, England, United Kingdom[1] | 54.5901, -1.4935 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}
: Check date values in:|date=
(help) - ↑ https://web.archive.org/web/20240126151059/https://www.wind-watch.org/news/2016/01/21/energy-giant-e-on-confirms-withdrawal-of-the-isles-wind-farm-scheme-near-sedgefield/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help)