ABC Hybrid SECI III wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

ABC Hybrid SECI III wind farm is a wind farm under construction in Neemba, Jaisalmer, Rajasthan, India.

Project Details

Table 1: Phase-level project details for ABC Hybrid SECI III wind farm

Status Nameplate capacity Type Owner
Construction[1] 126 MW[1] Onshore[2] ABC Renewable Energy [100%][3]

Location

Table 2: Phase-level location details for ABC Hybrid SECI III wind farm

Location Coordinates (WGS 84)
Neemba, Jaisalmer, Rajasthan, India[3] 26.7425, 70.4667 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://cea.nic.in/wp-content/uploads/rpm_division/2023/11/Report_On_Under_Construction_Renewable_Energy_Projects___Final_for_October_2023.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20240126114023/https://www.seci.co.in/Upload/Tender/SECI000016-2457337-RfS_ISTSWind-SolarHybridPowerDevelopers_1200MWT-III_finalupload.pdf. Archived from the original (PDF) on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 (PDF) https://www.seci.co.in/upload/Bidder/637505570251415734.pdf https://www.eqmagpro.com/abc-renewable-energy-signs-ppa-for-380-mw-solar-wind-hybrid-power-project-with-seci/, https://www.seci.co.in/upload/Bidder/637505570251415734.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)