ACWA wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

ACWA wind farm is an announced wind farm in New Valley, Egypt.

Project Details

Table 1: Phase-level project details for ACWA wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Construction[1][2] 2026 (planned)[1] 1100 MW[3] Onshore[1] Nasr General Contracting (HASSAN M. ALLAM) [25%]; ACWA Power Co [75%][1][1] ACWA Power; Nasr General Contracting (HASSAN M. ALLAM)[1][1]
2 Announced[4][5] 10000 MW[6] Unknown[7] New and Renewable Energy Authority (NREA) [100%] (هيئة الطاقة الجديدة والمتجددة)[5] ACWA Power[5]

Location

Table 2: Phase-level location details for ACWA wind farm

Phase Name Location Coordinates (WGS 84)
1 New Valley, Egypt[3] 26.254, 29.2675 (approximate)[3]
2 Sohag, Egypt[8][9] 26.558273, 31.67734 (approximate)[8][9]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240126074207/https://www.acwapower.com/news/ar-ae/acwa-power-led-consortium-comprising-hassan-allam-holding-signs-project-agreement-for-11gw-wind-project-in-egypt-worth-us15-billion-ar/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240126114328/https://www.acwapower.com/en/projects/suez-wind-energy-11-gw/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240125154440/https://energy-utilities.com/acwa-power-awarded-1-1gw-wind-power-project-in-news115199.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240126114418/https://amwalalghad.com/2023/03/26/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D8%B3%D8%AA%D9%87%D8%AF%D9%81-%D8%A5%D9%86%D8%AA%D8%A7%D8%AC-10-%D8%AC%D9%8A%D8%AC%D8%A7-%D9%88%D8%A7%D8%AA-%D9%85%D9%86-%D8%B7/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20240126114313/https://www.zawya.com/en/projects/utilities/acwa-power-plans-10gw-wind-energy-project-in-egypt-p0gp0u1r. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240125154142/https://arabic.euronews.com/next/2022/11/17/egypt-wind-ea6. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240126074112/https://www.thenationalnews.com/business/energy/2022/11/02/acwa-power-to-build-10-gigawatt-wind-farm-in-egypt/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://www.google.com/maps/place/Sohag+El-Khouly+Sohang+First+Sohag+Governorate+Egypt/@26.560460831.718624714z/data=!4m6!3m5!1s0x144f59375b0e09f1:0xa33bfcf664c5f2fe!8m2!3d26.5590737!4d31.6956705!16zL20vMGI1amdo?entry=ttu. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240131172307/https://www.egypt2.com/%D9%85%D8%AD%D8%B7%D8%A9-%D8%B1%D9%8A%D8%A7%D8%AD-%D8%BA%D8%B1%D8%A8-%D8%B3%D9%88%D9%87%D8%A7%D8%AC/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)