ADCC Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

ADCC Pipeline is a proposed natural gas pipeline in Texas, United States.[1]

Location

The pipeline is proposed to run from the Whistler Pipeline terminus in Agua Dulce to Corpus Christi LNG Terminal in Texas, United States.[1]

Loading map...

Project details

  • Operator:
  • Owner: Cheniere Energy; Whistler Pipeline LLC[1]
  • Parent company: Cheniere Energy; MPLX LP; Whitwater; Stonepeak; West Texas Gas Inc[2]
  • Capacity: 1.7 bcf/d[1]
  • Length: 43 mi[1]
  • Diameter: 42 in[1]
  • Status: Proposed[1]
  • Start year: 2024[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The project was proposed in September, 2022.

The pipeline would offer an initial 1.7 bcf/d capacity but could be expanded up to 2.5 bcf/d.

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Whistler Pipeline, Cheniere plot gas pipeline in Texas to Corpus Christi LNG terminal". Retrieved 2022-09-20.
  2. "Whistler Pipeline Announces a New Joint Venture Pipeline With Cheniere". Retrieved 2022-09-20.