AES Pelletier Solar, LLC
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
AES Pelletier Solar, LLC is a solar photovoltaic (PV) farm under construction in Fort Kent, Aroostook, Maine, United States.
Project Details
Table 1: Phase-level project details for AES Pelletier Solar, LLC
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|---|
PELLR | Construction[1] | 2023 (planned)[1] | 4 MWac[1] | PV[1] | AES Clean Energy[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for AES Pelletier Solar, LLC
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
PELLR | Fort Kent, Aroostook, Maine, United States[1] | 47.2355, -68.6183 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References